Two-Stage emergency material scheduling based on benders decomposition considering traffic congestion after a disaster

被引:4
|
作者
Hu, Hui [1 ]
Chen, Chaofeng [1 ]
Liu, Mengyuan [1 ]
Fu, Yihan [1 ]
Zhao, Jiao [1 ]
Feng, Zhiyu [1 ]
机构
[1] Changan Univ, Coll Transportat Engn, Xian 710061, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
Emergency material scheduling; Traffic congestion; GENERALIZED Benders decomposition (GBD); algorithm; Two-stage planning; FACILITY LOCATION; ALGORITHM; NETWORK; MODEL; DESIGN; TRANSPORTATION; ALLOCATION; PROGRAMS; SEARCH;
D O I
10.1016/j.cie.2022.108751
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This study establishes a stochastic mixed integer nonlinear programming model for a two-stage emergency multiclass material scheduling problem considering traffic congestion with a Bureau of Public Roads (BPR) function. The generalized Benders decomposition (GBD) algorithm is used to solve the model on the basis of the characteristics of the decomposable structure and nonlinear convex function. To prove the effectiveness of the GBD algorithm, we set up a 30-node medium-scale case and a 50-node large-scale case for experimental demonstration and compared the GBD algorithm with the simple branch and bound (SBB) and discrete and continuous optimization solvers. Results show that for the medium-scale experiment, the gap between the so-lution results of the GBD algorithm and the ones of SBB or other solvers is less than 0.2%. The solution time of the GBD algorithm is only half of the time of SBB and other solvers. The large-scale case of 50 nodes cannot be solved by the SBB or other solvers, whereas the GBD algorithm can solve it normally, and the results are reasonable. In large-scale cases with more than 50 nodes, the GBD algorithm is more effective and efficient compared with SBB and other solvers. The sensitivity of the correlation coefficient alpha in the BPR function was analyzed. The actual expected total cost increases with the increase in the value of alpha. Its solving results are accurate and reasonable, proving that the results are more practical and applicable after adding the BPR function.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] A loose Benders decomposition algorithm for approximating two-stage mixed-integer recourse models
    van der Laan, Niels
    Romeijnders, Ward
    MATHEMATICAL PROGRAMMING, 2021, 190 (1-2) : 761 - 794
  • [22] A Log-Barrier method with Benders decomposition for solving two-stage stochastic linear programs
    Gongyun Zhao
    Mathematical Programming, 2001, 90 : 507 - 536
  • [23] A two-stage approach for the multi-floor facility layout problem: Benders decomposition algorithm
    Karateke, Huseyin
    Sahin, Ramazan
    JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2021, 36 (02): : 953 - 969
  • [24] Two-Stage Robust Optimal Scheduling Considering Renewable Power Correlation
    Wang, Wenzhuo
    Hu, Xiangqing
    Su, Biao
    Li, Wujing
    Guo, Xiangyang
    Zhang, Qiwen
    Li, Xiaodong
    2024 7TH ASIA CONFERENCE ON ENERGY AND ELECTRICAL ENGINEERING, ACEEE 2024, 2024, : 322 - 326
  • [25] Two-Stage Stochastic Optimal Scheduling Model Considering Flexible Load
    Wang H.
    Qi Y.
    Wang C.
    Huang Y.
    Wang Y.
    Dianwang Jishu/Power System Technology, 2018, 42 (11): : 3669 - 3675
  • [26] Two-stage Scheduling for Island CPHH IES Considering Plateau Climate
    Pu, Yuchen
    Li, Qi
    Qiu, Yibin
    Zou, Xueli
    Chen, Weirong
    CSEE JOURNAL OF POWER AND ENERGY SYSTEMS, 2024, 10 (04): : 1775 - 1786
  • [27] Accelerating L-Shaped Two-Stage Stochastic SCUC With Learning Integrated Benders Decomposition
    Hasan, Fouad
    Kargarian, Amin
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2024,
  • [28] A loose Benders decomposition algorithm for approximating two-stage mixed-integer recourse models
    Niels van der Laan
    Ward Romeijnders
    Mathematical Programming, 2021, 190 : 761 - 794
  • [29] Two-stage robust optimisation for surgery scheduling considering surgeon collaboration
    Wang, Jin
    Guo, Hainan
    Tsui, Kwok-Leung
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (21) : 6437 - 6450
  • [30] Integration of Scheduling and Dynamic Optimization of Batch Processes under Uncertainty: Two-Stage Stochastic Programming Approach and Enhanced Generalized Benders Decomposition Algorithm
    Chu, Yunfei
    You, Fengqi
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2013, 52 (47) : 16851 - 16869