Factor-based target cost modelling for construction projects

被引:4
|
作者
Alwisy, Aladdin [1 ]
Bouferguene, Ahmed [2 ]
Al-Hussein, Mohamed [2 ]
机构
[1] Univ Alberta, CNRL Nat Resources Engn Facil, Dept Civil & Environm Engn, 4-110 Markin, Edmonton, AB T6G 2W2, Canada
[2] Univ Alberta, Dept Civil & Environm Engn, Donadeo Innovat Ctr 7 360A, Edmonton, AB T6G 1H9, Canada
关键词
target costing; target value design; target cost modelling; value analysis; rule-based analysis; cost estimating; regression analysis; ADOPTION;
D O I
10.1139/cjce-2017-0289
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Target value design (TVD) principles set the main guidelines for the design-estimate process that allow the efficient exploration of available construction alternatives, thereby helping construction companies to reduce cost-to-design, cost-to-build, and improve the quality of construction projects. The successful application of TVD requires a clear understanding of the interactions among construction components. The proposed target cost modelling approach introduces an algorithmic factor-based framework to advance TVD that supports the design-estimate process by examining the relationships among building components, their direct and indirect impact on project overall cost and value. Construction factors control compatibility and performance analysis among available construction alternatives. Costing factors contribute to the development of mathematical costing models capable of automatically calculating the cost of compatible alternatives. Finally, rule-based analysis, developed under an appropriate programming environment, executes alternative value analysis to develop a detailed estimate with an improved overall value for construction projects.
引用
收藏
页码:393 / 406
页数:14
相关论文
共 50 条
  • [31] COST CONTROL FOR MILL CONSTRUCTION PROJECTS
    HEATH, JB
    TAPPI, 1968, 51 (06): : A58 - +
  • [32] Cost Control of Arbitration in Construction Projects
    Mehany, Mohammed Hashem M.
    Jennings, Scott
    Kumar, Shantanu
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2022, 14 (02)
  • [33] MODELLING DELAYS IN BRIDGE CONSTRUCTION PROJECTS BASED ON THE LOGIT AND PROBIT REGRESSION
    Lesniak, A.
    Juszczyk, M.
    Piskorz, G.
    ARCHIVES OF CIVIL ENGINEERING, 2019, 65 (02) : 107 - 120
  • [34] A factor-based definition of precedential constraint
    Horty, John
    Bench-Capon, Trevor
    ARTIFICIAL INTELLIGENCE AND LAW, 2012, 20 (02) : 181 - 214
  • [35] An integrated BIM-based approach for cost estimation in construction projects
    Fazeli, Abdulwahed
    Dashti, Mohammad Saleh
    Jalaei, Farzad
    Khanzadi, Mostafa
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (09) : 2828 - 2854
  • [36] Construction Projects Priority Selection of Trading Patterns based on Transaction Cost
    Jiang Xin
    Zhang Wei
    Wei Xiongwei
    Peng Zhenli
    PROCEEDINGS OF THE 4TH CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEMS DYNAMICS, SSMSSD10, VOL 2, 2011, : 73 - 82
  • [37] Versatile Strategy for the Construction of a Transcription Factor-Based Orthogonal Gene Expression Toolbox in Monascus spp
    Duan, Yali
    Tan, Yingao
    Wei, Xuetuan
    Pei, Xiaolin
    Li, Mu
    ACS SYNTHETIC BIOLOGY, 2023, : 213 - 223
  • [38] Using Genetic Algorithms for Optimizing and Modelling Time, Cost and Quality Trade Offs of Construction Projects
    Bragadin, Marco A.
    Ballabeni, Andrea
    Kahkonen, Kalle
    IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2018, 9 (13): : 200 - 207
  • [39] Innovation transfer in construction: re-interpreting factor-based research from the perspective of the social construction of technology (SCOT)
    Wafai, Mohamad Hassan
    Aouad, Ghassan
    CONSTRUCTION INNOVATION-ENGLAND, 2023, 23 (05): : 1323 - 1344
  • [40] Cost Based Value Stream Mapping as a Sustainable Construction Tool for Undergraound Pipeline Construction Projects
    Gunduz, Murat
    Naser, Ayman Fahmi
    SUSTAINABILITY, 2017, 9 (12)