Factor-based target cost modelling for construction projects

被引:4
|
作者
Alwisy, Aladdin [1 ]
Bouferguene, Ahmed [2 ]
Al-Hussein, Mohamed [2 ]
机构
[1] Univ Alberta, CNRL Nat Resources Engn Facil, Dept Civil & Environm Engn, 4-110 Markin, Edmonton, AB T6G 2W2, Canada
[2] Univ Alberta, Dept Civil & Environm Engn, Donadeo Innovat Ctr 7 360A, Edmonton, AB T6G 1H9, Canada
关键词
target costing; target value design; target cost modelling; value analysis; rule-based analysis; cost estimating; regression analysis; ADOPTION;
D O I
10.1139/cjce-2017-0289
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Target value design (TVD) principles set the main guidelines for the design-estimate process that allow the efficient exploration of available construction alternatives, thereby helping construction companies to reduce cost-to-design, cost-to-build, and improve the quality of construction projects. The successful application of TVD requires a clear understanding of the interactions among construction components. The proposed target cost modelling approach introduces an algorithmic factor-based framework to advance TVD that supports the design-estimate process by examining the relationships among building components, their direct and indirect impact on project overall cost and value. Construction factors control compatibility and performance analysis among available construction alternatives. Costing factors contribute to the development of mathematical costing models capable of automatically calculating the cost of compatible alternatives. Finally, rule-based analysis, developed under an appropriate programming environment, executes alternative value analysis to develop a detailed estimate with an improved overall value for construction projects.
引用
收藏
页码:393 / 406
页数:14
相关论文
共 50 条
  • [21] Factor-based robust index tracking
    Roy H. Kwon
    Dexiang Wu
    Optimization and Engineering, 2017, 18 : 443 - 466
  • [22] Modelling a cost profile for road projects
    Akinradewo, Opeoluwa
    Aigbavboa, Clinton
    Oke, Ayodeji
    Coffie, Harrison
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2021, 48 (04) : 366 - 376
  • [23] Adjusted Factor-Based Performance Attribution
    Stubbs, Robert A.
    Jeet, Vishv
    JOURNAL OF PORTFOLIO MANAGEMENT, 2016, 42 (05): : 67 - 78
  • [24] Trade and Democracy: A Factor-Based Approach
    Doces, John A.
    Magee, Christopher S. P.
    INTERNATIONAL INTERACTIONS, 2015, 41 (02) : 407 - 425
  • [25] FACTOR-BASED SPECIAL SCALES FOR THE MCMI
    RETZLAFF, PD
    GIBERTINI, M
    JOURNAL OF CLINICAL PSYCHOLOGY, 1990, 46 (01) : 47 - 52
  • [26] Factor-based comparison of k populations
    Viguier-Pla, S
    STATISTICS, 2004, 38 (01) : 1 - 15
  • [27] Factor-based comparison of groups of curves
    Ferraty, Frederic
    Vieu, Philippe
    Viguier-Pla, Sylvie
    COMPUTATIONAL STATISTICS & DATA ANALYSIS, 2007, 51 (10) : 4903 - 4910
  • [28] Least - cost scheduling of Construction Projects
    Faheem, Miriqbal
    Basha, Syed Saleem
    Kalam, M.A.
    International Journal of Earth Sciences and Engineering, 2010, 3 (05): : 753 - 761
  • [29] Improving cost estimation in construction projects
    Sayed, Mohamed
    Abdel-Hamid, Mohamed
    El-Dash, Karim
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (01) : 135 - 143
  • [30] CHARACTERISTICS OF COST MANAGEMENT IN CONSTRUCTION PROJECTS
    Simion-Melinte, Cezar
    GLOBALIZATION AND INTERCULTURAL DIALOGUE: MULTIDISCIPLINARY PERSPECTIVES - ECONOMY AND MANAGEMENT, 2014, : 810 - 818