Single-Machine Production Scheduling Integrated Preventive Maintance Planning for Minimizing Makespan and Flow Time

被引:0
|
作者
Xu, Shengliang [1 ,2 ]
Wang, Liya [1 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Mech Engn, Shanghai 200240, Peoples R China
[2] Shanghai DianJi Univ, Sch Business, Shanghai 201306, Peoples R China
基金
美国国家科学基金会;
关键词
Production scheduling; Maintenance planning; Makespan; Flow time; MAINTENANCE;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper studies single-machine scheduling with preventative maintenance with fixed maintenance cycles or flexible maintenance cycles. Both makespan and total flow time, two common objectives in production planning, are used to evaluate the integrated production and maintenance schedules. Four formulations based on the bin packing problem are provides for the two schemes and two objectives. Heuristic or exact-solution approaches are developed to attack the computational challenges for large instances with jobs that are difficult to pack. Numerical experiments demonstrate the effectiveness of the development algorithm and suggest that flexible maintenance could significant improve the two objectives when jobs cannot fill maintenance cycles well.
引用
收藏
页码:1513 / 1517
页数:5
相关论文
共 50 条
  • [31] Single-machine batch scheduling minimizing weighted flow times and delivery costs
    Mazdeh, Mohammad Mandavi
    Shashaani, Sara
    Ashouri, Armin
    Hindi, Khalil S.
    [J]. APPLIED MATHEMATICAL MODELLING, 2011, 35 (01) : 563 - 570
  • [32] On-line supply chain scheduling for single-machine and parallel-machine configurations with a single customer: Minimizing the makespan and delivery cost
    Han, Bin
    Zhang, Wenjun
    Lu, Xiwen
    Lin, Yingzi
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (03) : 704 - 714
  • [33] Minimizing value-at-risk in single-machine scheduling
    Atakan, Semih
    Bulbul, Kerem
    Noyan, Nilay
    [J]. ANNALS OF OPERATIONS RESEARCH, 2017, 248 (1-2) : 25 - 73
  • [34] Minimizing value-at-risk in single-machine scheduling
    Semih Atakan
    Kerem Bülbül
    Nilay Noyan
    [J]. Annals of Operations Research, 2017, 248 : 25 - 73
  • [35] MINIMIZING WEIGHTED ABSOLUTE DEVIATION IN SINGLE-MACHINE SCHEDULING
    FRY, TD
    ARMSTRONG, RD
    BLACKSTONE, JH
    [J]. IIE TRANSACTIONS, 1987, 19 (04) : 445 - 450
  • [36] Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
    Cassady, CR
    Kutanoglu, E
    [J]. IIE TRANSACTIONS, 2003, 35 (06) : 503 - 513
  • [37] Minimizing the total completion time in a single-machine scheduling problem with a learning effect
    Low, Chinyao
    Lin, Wen-Yi
    [J]. APPLIED MATHEMATICAL MODELLING, 2011, 35 (04) : 1946 - 1951
  • [38] Minimizing the makespan in a single machine scheduling problem with a flexible maintenance
    Yang, Dar-Li
    Hung, Ching-Lien
    Hsu, Chou-Jung
    Chem, Maw-Sheng
    [J]. Journal of the Chinese Institute of Industrial Engineers, 2002, 19 (01): : 63 - 66
  • [39] MINIMIZING FLOW TIME ON A SINGLE-MACHINE WITH JOB CLASSES AND SETUP TIMES
    MASON, AJ
    ANDERSON, EJ
    [J]. NAVAL RESEARCH LOGISTICS, 1991, 38 (03) : 333 - 350
  • [40] Minimizing the makespan in a single machine scheduling problem with a time-based learning effect
    Kuo, WH
    Yang, DL
    [J]. INFORMATION PROCESSING LETTERS, 2006, 97 (02) : 64 - 67