MINIMIZING WEIGHTED ABSOLUTE DEVIATION IN SINGLE-MACHINE SCHEDULING

被引:82
|
作者
FRY, TD
ARMSTRONG, RD
BLACKSTONE, JH
机构
[1] RUTGERS STATE UNIV,GRAD SCH MANAGEMENT,NEW BRUNSWICK,NJ 08903
[2] UNIV GEORGIA,MANAGEMENT,ATHENS,GA 30602
关键词
D O I
10.1080/07408178708975418
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:445 / 450
页数:6
相关论文
共 50 条
  • [1] MINIMIZING THE SUM OF ABSOLUTE LATENESS IN SINGLE-MACHINE AND MULTIMACHINE SCHEDULING
    SUNDARARAGHAVAN, PS
    AHMED, MU
    [J]. NAVAL RESEARCH LOGISTICS, 1984, 31 (02) : 325 - 333
  • [2] Minimizing weighted mean absolute deviation of flow times in single machine systems
    Aneja, YP
    Kabadi, SN
    Nagar, A
    [J]. NAVAL RESEARCH LOGISTICS, 1998, 45 (03) : 297 - 311
  • [3] Single-machine batch scheduling minimizing weighted flow times and delivery costs
    Mazdeh, Mohammad Mandavi
    Shashaani, Sara
    Ashouri, Armin
    Hindi, Khalil S.
    [J]. APPLIED MATHEMATICAL MODELLING, 2011, 35 (01) : 563 - 570
  • [4] Minimizing weighted earliness and tardiness penalties in single-machine scheduling with idle time permitted
    Chen, JY
    Lin, SF
    [J]. NAVAL RESEARCH LOGISTICS, 2002, 49 (08) : 760 - 780
  • [5] Minimizing value-at-risk in single-machine scheduling
    Atakan, Semih
    Bulbul, Kerem
    Noyan, Nilay
    [J]. ANNALS OF OPERATIONS RESEARCH, 2017, 248 (1-2) : 25 - 73
  • [6] Minimizing value-at-risk in single-machine scheduling
    Semih Atakan
    Kerem Bülbül
    Nilay Noyan
    [J]. Annals of Operations Research, 2017, 248 : 25 - 73
  • [8] Minimizing total weighted completion time in semiresumable case of single-machine scheduling with an availability constraint
    Ma, Ying
    Chu, Cheng-Bin
    Yang, Shan-Lin
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2009, 29 (02): : 134 - 143
  • [9] Algorithm for minimizing weighted earliness penalty in single-machine problem
    Pathumnakul, S
    Egbelu, PJ
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 161 (03) : 780 - 796
  • [10] MINIMIZING THE WEIGHTED SUM OF QUADRATIC COMPLETION TIMES ON A SINGLE-MACHINE
    DELLACROCE, F
    SZWARC, W
    TADEI, R
    BARACCO, P
    DITULLIO, R
    [J]. NAVAL RESEARCH LOGISTICS, 1995, 42 (08) : 1263 - 1270