Mathematical models for the cement clinker burning process - Part 5: Complete plant

被引:0
|
作者
Locher, G
机构
来源
ZKG INTERNATIONAL | 2002年 / 55卷 / 07期
关键词
Kilns - Lime - Mathematical models - Preheating - Process engineering - Sintering;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The basic principles of the calculations and the models of the preheater calciner gas off-take, kiln and cooler have been described in the previous parts of the publication. In this final part of the series of publications these models are combined to form a complete model which should make it possible to improve the mode of operation of kiln plants. The effects of additional cyclone stages, the collecting efficiency of the cyclone stages, the dust burden of the kiln gas, the operation of a bypass, lowering the sintering zone temperature, the distribution of the cooling air in the clinker the depth of the clinker bed in the cooler and the lime content of the kiln meal on the fuel energy requirement and temperature profile of the kiln plant have been calculated as examples of the application of the model.
引用
收藏
页码:25 / +
页数:11
相关论文
共 47 条
  • [1] Mathematical models for the cement clinker burning process Part 4: Grate cooler
    Locher, G
    [J]. ZKG INTERNATIONAL, 2002, 55 (06): : 46 - +
  • [2] Mathematical models for the cement clinker burning process Part 3: Rotary kiln
    Locher, G
    [J]. ZKG INTERNATIONAL, 2002, 55 (03): : 68 - +
  • [3] Mathematical models for the cement clinker burning process Part 1: Reactions and operations
    Locher, G
    [J]. ZKG INTERNATIONAL, 2002, 55 (01): : 29 - 38
  • [4] Mathematical models for the cement clinker burning process Part 2: Preheater, calciner and bypass
    Locher, G
    [J]. ZKG INTERNATIONAL, 2002, 55 (01): : 39 - 50
  • [5] Mathematical models for the cement clinker burning process: Part 1: Reactions and unit operations
    Locher, G.
    [J]. 2002, Bauverlag GmbH (55):
  • [6] Modelling and simulation of the cement clinker burning process
    Klein, H
    Urbanke, D
    Wiechert, W
    [J]. SIMULATION IN INDUSTRY'2000, 2000, : 253 - 257
  • [7] Multistage process for burning Portland cement clinker
    Pike, RD
    [J]. INDUSTRIAL AND ENGINEERING CHEMISTRY, 1930, 22 : 148 - 152
  • [8] PULVERIZED LIGNITE FOR CEMENT CLINKER BURNING BY THE ZAB DRY PROCESS
    HUCKAUF, H
    GLEICHMAR, G
    MORGENSTERN, W
    [J]. ZEMENT-KALK-GIPS, 1982, 35 (01): : 28 - 32
  • [9] Utilization of waste heat from rotary kiln for burning clinker in the cement plant
    Sztekler, Karol
    Komorowski, Maciej
    Tarnowska, Milena
    Posak, Lukasz
    [J]. 1ST INTERNATIONAL CONFERENCE ON THE SUSTAINABLE ENERGY AND ENVIRONMENT DEVELOPMENT (SEED 2016), 2016, 10
  • [10] Using the ORC process for waste heat utilization when burning cement clinker
    Huckauf, H
    Sankol, A
    [J]. ZKG INTERNATIONAL, 2000, 53 (03): : 146 - 151