SPECIFIC CHARACTER OF DONSKOY CHROMITES DEVELOPMENT IN COMPLEX MINING AND GEOLOGICAL CONDITIONS

被引:0
|
作者
Zherebko, L. [1 ]
Shamganova, L. [1 ]
Jangulova, G. [2 ]
Kassymkanova, Kh. [2 ]
Bektur, B. [3 ]
机构
[1] Inst Min Name DA Kunayev, Alma Ata, Kazakhstan
[2] KazNU Name AlFarabi, Alma Ata, Kazakhstan
[3] KazNRTU Name KI Satpayev, Alma Ata, Kazakhstan
关键词
Geomechanical processes; mining system; rock pressure; caving zone;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
While developing ore deposits at the large depths using uncontrolled caving system the geochemical situation at various sections of the mines field will be controversial. As it is evident from the synoptical analysis of the technological schemes of thick ore deposits development at Donskoy MCC fields, their common feature is generation of the mined out spaces during the second mining, which are compensated with the overlaying rocks mass in the course of uncontrolled caving. This phenomena and its development process have significant meaning in solving the issues of negative technogenic evidences occurrence during underground development of ore deposits. As the result of second minigs with uncontrolled caving system,the geotechnical and geomechanical processes are developing in the overlaying solid mass causing the solid mass weakening and uncontrolled caving. At the same time the parameters and nature of the caving zones are directly correlating to the sizes of the stoping zone, volumes of the extracted ore mass and geotechnical properties of the overlaying rocks mass.
引用
收藏
页码:775 / 789
页数:15
相关论文
共 50 条
  • [31] Transition and continuation scheme of open-pit mining area under complex engineering geological conditions
    Liu, Guangwei
    Tu, Junxiong
    Guo, Weiqiang
    Han, Yuxuan
    Li, Chunlin
    Bai, Yu
    Yu, Mingyu
    Jia, Ruijun
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2025, 53 (03): : 447 - 457
  • [32] Factors determining the intensity of loading of long operated gas pipelines under complex mining and geological conditions
    Krizhanivskiy, Evstakhy
    Taraevskiy, Oleg
    Metallurgical and Mining Industry, 2015, 7 (08): : 516 - 520
  • [33] Specific character of sustainable innovative development of transport construction in self-regulation conditions
    Gumba, Khuta
    Belyaeva, Svetlana
    ENERGY MANAGEMENT OF MUNICIPAL TRANSPORTATION FACILITIES AND TRANSPORT (EMMFT 2017), 2017, 90
  • [34] GEOLOGICAL CONDITIONS OF THE FORMATION OF COMPLEX TUNGSTEN DEPOSITS
    VOEVODIN, VN
    DOKLADY AKADEMII NAUK SSSR, 1979, 248 (02): : 415 - 418
  • [35] Numerical Simulation Modeling and Calculation Analysis on Stope Roof Stability Under the Complex Geological Conditions in Deep Mining
    Hu Hua
    Cao Yong
    2009 INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATION, 2009, : 175 - 177
  • [36] GEOLOGICAL AND MINING CONDITIONS FOR THE EFFECTIVE DEVELOPMENT OF CONSTRUCTION AND CRUSHED STONE DEPOSITS WITHIN THE DISTRIBUTION OF GLACIAL SEDIMENTS
    Lukomskyi, Vladyslav
    Kurylo, Mariia
    VISNYK OF TARAS SHEVCHENKO NATIONAL UNIVERSITY OF KYIV-GEOLOGY, 2024, (03): : 57 - 61
  • [37] Adapting the Powered Roof Support to Diverse Mining and Geological Conditions
    Szurgacz, Dawid
    Brodny, Jaroslaw
    ENERGIES, 2020, 13 (02)
  • [38] Framework and thinking of transparent geological conditions for precise mining of coal
    Yuan L.
    Zhang P.
    1600, China Coal Society (45): : 2346 - 2356
  • [39] Prediction of railway subgrade subsidence based on geological mining conditions
    Ding Y.
    Deng N.
    Yao T.
    Liu D.
    Shang H.
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2022, 50 (07): : 135 - 145
  • [40] PREDICTIVE GEOLOGICAL MAPPING OF MINING CONDITIONS IN APPALACHIAN COAL FIELDS
    MILLER, MS
    AAPG BULLETIN-AMERICAN ASSOCIATION OF PETROLEUM GEOLOGISTS, 1982, 66 (08): : 1172 - 1172