共 50 条
- [24] Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (1-4): : 309 - 325
- [25] Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers The International Journal of Advanced Manufacturing Technology, 2012, 58 : 309 - 325
- [28] Solving Bi-Objective Flow Shop Problem with Multi-Objective Path Relinking Algorithm 2014 10TH INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION (ICNC), 2014, : 343 - 348
- [30] An Improved Multi-objective Memetic Algorithm for Bi-objective Permutation Flow Shop Scheduling 2017 14TH INTERNATIONAL CONFERENCE ON SERVICES SYSTEMS AND SERVICES MANAGEMENT (ICSSSM), 2017,