Dynamic Simulation of Immersion of Tunnel Elements for Busan - Geoje Fixed Link Project

被引:0
|
作者
Chakrabarti, Partha
Chakrabarti, Subrata K.
Olsen, Tommy
Sig, Koo Im
Whan, Kim Chang
Wook, Huh Jin
机构
关键词
D O I
暂无
中图分类号
P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
Construction of an 8.21km motorway between Busan - Korea's southernmost, second largest city - and the island of Geoje, called the Busan-Geoje Fixed Link Project, is currently underway. As part of this four-lane fixed link, there will be a submerged tunnel section of 3.2km in length. COWI and Daewoo Engineering Co. have formed a joint venture (CDJV) to carry out the design of the immersed tube tunnel (Busan-Geoje Fixed Link Immersed Tunnel). The Immersed Tunnel consists of 18 Tunnel Elements and will be constructed from East to West. The immersed tunnel will become one of the longest in the world to date, especially in an area of significant seismic activity. Each of the 18 elements is identical, although they will be placed in water depths varying from 15m up to 50m subjected to waves and current. The prefabricated tunnel section will be brought to the site in a submerged condition, where it will be suspended from immersion rigs by four wire ropes. Each tunnel section will be lowered and connected to the previously installed element. The immersion rig pontoons and the submerged tunnel element will be moored to stay in position using as many as 14 wire ropes. This paper describes the unique immersion concept specially developed for this project, the salient features of each phase of analysis and the major conclusions. The findings in this study are expected to aid designers of similar immersion process concepts to ensure safe installation.
引用
收藏
页码:645 / 661
页数:17
相关论文
共 7 条
  • [1] Busan Geoje Fixed Link
    van Westendorp, Peter
    Louis, Bard
    Jackson, Peter
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 122
  • [2] ANALYSIS OF THE TUNNEL IMMERSION FOR THE BUSAN-GEOJE FIXED LINK PROJECT THROUGH SCALE MODEL TESTS AND COMPUTER SIMULATIONS
    Cozijn, Hans
    Heo, Jin Wook
    [J]. OMAE 2009, VOL 1: OFFSHORE TECHNOLOGY, 2009, : 375 - 384
  • [3] The Immersed Tunnel and Bridges of Busan-Geoje Fixed Link
    Jeong, Sangkyoon
    Kim, Jechun
    [J]. STRUCTURAL ENGINEERING INTERNATIONAL, 2012, 22 (01) : 20 - 25
  • [4] Design and construction of Busan-Geoje fixed link, S. Korea
    Yeoward, A.
    Koo, I. S.
    Fraser, D.
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2010, 163 (02) : 59 - 66
  • [5] Application of Grouting the Sea-Crossing Bridge foundation in the Busan-Geoje Fixed Link
    Jeong, Gyeong-Hwan
    Park, Chan-Woo
    Kwon, Jin-Wook
    Kim, Jae-Hwan
    Kim, Chang Hwan
    Jeong, Sang-Kyoon
    [J]. PROCEEDINGS OF THE EIGHTEENTH (2008) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 2, 2008, : 641 - +
  • [6] Reliability-based durability design and quality control of long span bridge of Busan-Geoje Fixed Link project in Korea
    Kim, S.
    Jeong, S.
    Kim, J.
    Koo, I.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 1823 - 1829
  • [7] Dynamic numerical simulation for the problem of tunnel rock mass large deformation of a hydropower project in the upper reaches of Lancang River
    Li, Yusheng
    Cao, Guangpeng
    Bao, Jie
    [J]. ADVANCED BUILDING MATERIALS, PTS 1-4, 2011, 250-253 (1-4): : 1315 - 1319