ANALYSIS OF THE TUNNEL IMMERSION FOR THE BUSAN-GEOJE FIXED LINK PROJECT THROUGH SCALE MODEL TESTS AND COMPUTER SIMULATIONS

被引:0
|
作者
Cozijn, Hans [1 ]
Heo, Jin Wook [1 ]
机构
[1] MARIN, Offshore Dept, Wageningen, Netherlands
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
In Korea a four lane motorway is constructed between the city of Busan and the island Geoje, reducing traveling times from 1 hour by ferry to just 10 minutes by car. The so-called Busan-Geoje Fixed Link consists of 2 cable-stayed girder bridges and a tunnel, crossing the bay of Jinhae. The submerged tunnel is built by transporting each of its 18 elements below 2 pontoons from a construction dock to their final positions and lowering them on the sea bed. The project is unique, because the tunnel elements are installed in a bay with direct access towards open sea. For this reason, the effects of incoming swells and wind seas were investigated in detail, so that the operational limits of the tunnel element immersion could be accurately determined. This was achieved by using an approach of combined hydrodynamic scale model tests and time-domain computer simulations.
引用
收藏
页码:375 / 384
页数:10
相关论文
共 3 条
  • [1] The Immersed Tunnel and Bridges of Busan-Geoje Fixed Link
    Jeong, Sangkyoon
    Kim, Jechun
    [J]. STRUCTURAL ENGINEERING INTERNATIONAL, 2012, 22 (01) : 20 - 25
  • [2] Dynamic Simulation of Immersion of Tunnel Elements for Busan - Geoje Fixed Link Project
    Chakrabarti, Partha
    Chakrabarti, Subrata K.
    Olsen, Tommy
    Sig, Koo Im
    Whan, Kim Chang
    Wook, Huh Jin
    [J]. PROCEEDINGS OF THE 27TH INTERNATIONAL CONFERENCE ON OFFSHORE MECHANICS AND ARCHTIC ENGINEERING - 2008, VOL 4, 2008, : 645 - 661
  • [3] Reliability-based durability design and quality control of long span bridge of Busan-Geoje Fixed Link project in Korea
    Kim, S.
    Jeong, S.
    Kim, J.
    Koo, I.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 1823 - 1829