A hybrid method for large-scale short-term scheduling of make-and-pack production processes

被引:28
|
作者
Baumann, Philipp [1 ]
Trautmann, Norbert [1 ]
机构
[1] Univ Bern, Dept Business Adm, CH-3012 Bern, Switzerland
基金
瑞士国家科学基金会;
关键词
Scheduling; Make-and-pack production; Hybrid method; Real-world production process; MULTISTAGE BATCH PLANTS; CONTINUOUS-TIME REPRESENTATION; MIXED-INTEGER; GENETIC ALGORITHM; SINGLE-STAGE; MILP MODEL; FORMULATION; FRAMEWORK; FLOWSHOP;
D O I
10.1016/j.ejor.2013.12.040
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Due to the ongoing trend towards increased product variety, fast-moving consumer goods such as food and beverages, pharmaceuticals, and chemicals are typically manufactured through so-called make-and-pack processes. These processes consist of a make stage, a pack stage, and intermediate storage facilities that decouple these two stages. In operations scheduling, complex technological constraints must be considered, e.g., non-identical parallel processing units, sequence-dependent changeovers, batch splitting, no-wait restrictions, material transfer times, minimum storage times, and finite storage capacity. The short-term scheduling problem is to compute a production schedule such that a given demand for products is fulfilled, all technological constraints are met, and the production makespan is minimised. A production schedule typically comprises 500-1500 operations. Due to the problem size and complexity of the technological constraints, the performance of known mixed-integer linear programming (MILP) formulations and heuristic approaches is often insufficient. We present a hybrid method consisting of three phases. First, the set of operations is divided into several subsets. Second, these subsets are iteratively scheduled using a generic and flexible MILP formulation. Third, a novel critical path-based improvement procedure is applied to the resulting schedule. We develop several strategies for the integration of the MILP model into this heuristic framework. Using these strategies, high-quality feasible solutions to large-scale instances can be obtained within reasonable CPU times using standard optimisation software. We have applied the proposed hybrid method to a set of industrial problem instances and found that the method outperforms state-of-the-art methods. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:718 / 735
页数:18
相关论文
共 50 条
  • [21] A cyclic approach to large-scale short-term planning in chemical batch production
    Norbert Trautmann
    Christoph Schwindt
    Journal of Scheduling, 2009, 12 : 595 - 606
  • [22] A cyclic approach to large-scale short-term planning in chemical batch production
    Trautmann, Norbert
    Schwindt, Christoph
    JOURNAL OF SCHEDULING, 2009, 12 (06) : 595 - 606
  • [23] A Two-stage Simulated Annealing-based Scheduling Algorithm for a Make-and-Pack Production Plant
    Yfantis, Vassilios
    Buescher, Sven
    Klanke, Christian
    Corominas, Francesc
    Engell, Sebastian
    IFAC PAPERSONLINE, 2020, 53 (02): : 10779 - 10784
  • [24] Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head
    Cheng, Chuntian
    Shen, Jianjian
    Wu, Xinyu
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2012, 138 (03) : 257 - 267
  • [25] Short-Term Scheduling of a Large-Scale Oil-Refinery Operations: Incorporating Logistics Details
    Shah, Nikisha K.
    Ierapetritou, Marianthi G.
    AICHE JOURNAL, 2011, 57 (06) : 1570 - 1584
  • [26] Short-Term Forecasting of Power Production in a Large-Scale Photovoltaic Plant Based on LSTM
    Gao, Mingming
    Li, Jianjing
    Hong, Feng
    Long, Dongteng
    APPLIED SCIENCES-BASEL, 2019, 9 (15):
  • [27] RESOURCE REDISTRIBUTION METHOD FOR SHORT-TERM RECOVERY OF SOCIETY AFTER LARGE-SCALE DISASTERS
    Lubashevskiy, Vasily
    Kanno, Taro
    Furuta, Kazuo
    ADVANCES IN COMPLEX SYSTEMS, 2014, 17 (05):
  • [28] SCHEDULING IN LARGE-SCALE PRODUCTION SYSTEMS - A MEDIUM TERM PRODUCTION MANAGEMENT MODEL
    MEIER, K
    PROTH, JM
    ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1988, 14 (01): : 67 - 74
  • [29] Medium-term stochastic hydrothermal scheduling with short-term operational effects for large-scale power and water networks
    Navarro, Andres
    Favereau, Marcel
    Lorca, Alvaro
    Olivares, Daniel
    Negrete-Pincetic, Matias
    APPLIED ENERGY, 2024, 358
  • [30] Operations Scheduling in Make-and-Pack Production: Schedule Construction and GA-based Priority-Rule Generation Procedures
    Baumann, Philipp
    Trautmann, Norbert
    2012 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2012, : 454 - 458