Medium-term stochastic hydrothermal scheduling with short-term operational effects for large-scale power and water networks

被引:2
|
作者
Navarro, Andres [1 ]
Favereau, Marcel [2 ,3 ]
Lorca, Alvaro [1 ,3 ,4 ]
Olivares, Daniel [5 ]
Negrete-Pincetic, Matias [1 ]
机构
[1] Pontificia Univ Catolica Chile, Dept Elect Engn, Santiago 7820436, Chile
[2] Univ Andres Bello, Dept Engn Sci, Santiago 7500971, Chile
[3] Pontificia Univ Catolica Chile, Dept Ind & Syst Engn, Santiago 7820436, Chile
[4] Pontificia Univ Catolica Chile, UC Energy Res Ctr, Santiago 7820436, Chile
[5] Univ Adolfo Ibanez, Fac Engn & Sci, Santiago 7941169, Chile
关键词
OR in energy; Hydrothermal scheduling; Optimization under uncertainty; Renewable energy; Stochastic dual dynamic programming; SECTOR VARIABILITY; OPTIMIZATION; INTEGRATION; SYSTEMS; MODEL; WIND;
D O I
10.1016/j.apenergy.2023.122554
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The high integration of variable renewable sources in electric power systems entails a series of challenges inherent to their intrinsic variability. A critical challenge is to correctly value the water available in reservoirs in hydrothermal systems, considering the flexibility that it provides. In this context, this paper proposes a medium -term multistage stochastic optimization model for the hydrothermal scheduling problem solved with the stochastic dual dynamic programming algorithm. The proposed model includes operational constraints and simplified mathematical expressions of relevant operational effects that allow more informed assessment of the water value by considering, among others, the flexibility necessary for the operation of the system. In addition, the hydrological uncertainty in the model is represented by a vector autoregressive process, which allows capturing spatio-temporal correlations between the different hydro inflows. A calibration method for the simplified mathematical expressions of operational effects is also proposed, which allows a detailed shortterm operational model to be correctly linked to the proposed medium -term linear model. Through extensive experiments for the Chilean power system, the results show that the difference between the expected operating costs of the proposed medium -term model, and the costs obtained through a detailed short-term operational model was only 0.1%, in contrast to the 9.3% difference obtained when a simpler base model is employed. This shows the effectiveness of the proposed approach. Further, this difference is also reflected in the estimation of the water value, which is critical in water shortage situations.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Production scheduling of a large-scale industrial continuous plant: Short-term and medium-term scheduling
    Shaik, Munawar A.
    Floudas, Christodoulos A.
    Kallrath, Josef
    Pitz, Hans-Joachim
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2009, 33 (03) : 670 - 686
  • [2] Production Scheduling of a Large-Scale Industrial Continuous Plant: Short-Term and Medium-Term Scheduling
    Shaik, Munawar A.
    Floudas, Christodoulos A.
    Kallrath, Josef
    Pitz, Hans-Joachim
    [J]. 17TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2007, 24 : 613 - 618
  • [3] MODULAR AND FLEXIBLE SOFTWARE FOR MEDIUM-TERM AND SHORT-TERM HYDROTHERMAL SCHEDULING
    SHERKAT, VR
    MOSLEHI, K
    LO, EO
    SANCHEZ, G
    DIAZ, J
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (03) : 1390 - 1396
  • [4] Production scheduling of a large-scale industrial batch plant. I. Short-term and medium-term scheduling
    Janak, Stacy L.
    Floudas, Christodoulos A.
    Kallrath, Josef
    Vormbrock, Norbert
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2006, 45 (25) : 8234 - 8252
  • [5] State-of-the Art in Short-Term, Medium-Term, and Reactive Scheduling for Large-Scale Batch and Continuous Processes
    Floudas, Christodoulos A.
    [J]. 17TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2007, 24 : 33 - 34
  • [6] Integrated operational planning and medium-term scheduling for large-scale industrial batch plants
    Verderame, Peter A.
    Floudas, Christodoulos A.
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2008, 47 (14) : 4845 - 4860
  • [7] OPTIMAL SHORT-TERM SCHEDULING OF LARGE-SCALE POWER-SYSTEMS
    BERTSEKAS, DP
    LAUER, GS
    SANDELL, NR
    POSBERGH, TA
    [J]. IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1983, 28 (01) : 1 - 11
  • [8] Parallelized Stochastic Short-term Hydrothermal Generation Scheduling
    Araya, Juan
    Gil, Esteban
    [J]. 2016 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PESGM), 2016,
  • [9] Optimization of short-term scheduling of power plant units in large-scale cogeneration systems
    Hönig, P
    Welfonder, E
    [J]. POWER PLANTS AND POWER SYSTEMS CONTROL 2000, 2000, : 287 - 295
  • [10] SHORT-TERM AND MEDIUM-TERM EFFECTS OF COLZA OIL IN RAT
    ARRIGO, L
    CIANGHER.S
    [J]. BOLLETTINO DELLA SOCIETA ITALIANA DI BIOLOGIA SPERIMENTALE, 1973, 49 (18): : 239 - 239