Maintenance intervention optimisation for existing railway bridges

被引:0
|
作者
Nielsen, D. [1 ]
McSweeney, T. [1 ]
Raman, D. [1 ]
机构
[1] CQUniv Australia, Rockhampton, Qld, Australia
来源
BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION | 2014年
关键词
Life cycle costing; Bridges; Railway; Maintenance; Optimisation; Maintenance strategies; LIFETIME FUNCTIONS; EMPHASIS; COST;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Maintenance of aging infrastructure is a burden on many organisational budgets, and Life Cycle Cost Analysis (LCCA) is accepted as an effective method to reduce these costs. However, LCCA becomes extremely complex when applied at the individual bridge component level within a large bridge population while considering multiple maintenance strategies, varying deterioration rates and intervention intervals. To address this concern, a decision support model is presented that proposes maintenance actions for future interventions based on a selection of maintenance strategies and given organisational budget constraints. The remaining service life of surrounding components is considered when assessing the most appropriate maintenance actions. Three popular bridge management strategies are considered in this model, comprising refurbishment, upgrade and renewal strategies. The infrastructure manager may apply one of these three strategies at the bridge level to estimate future network budgets or align with existing budgets. The developed decision support application allows "what-if' scenarios to be generated to determine life cycle costs by changing life gained from maintenance actions, maintenance costs, maintenance strategy, discount rate, intervention trigger time and minimum intervention intervals.
引用
收藏
页码:2733 / 2740
页数:8
相关论文
共 50 条
  • [41] Design and optimisation of 3D-printed energy harvesters for railway bridges
    Camara-Molina, J. C.
    Romero, A.
    Galvin, P.
    Moliner, E.
    Martinez-Rodrigo, M. D.
    XII INTERNATIONAL CONFERENCE ON STRUCTURAL DYNAMICS, EURODYN 2023, 2024, 2647
  • [42] A methodology for the preliminary assessment of existing railway bridges for high-speed traffic
    Johansson, C.
    Ni Nuallain, N. A.
    Pacoste, C.
    Andersson, A.
    ENGINEERING STRUCTURES, 2014, 58 : 25 - 35
  • [43] A Comprehensive Reliability Assessment Method for Existing Railway Bridges Based on Bayesian Theory
    Li, Zhonglong
    Chen, Xiaowei
    Bing, Haonan
    Zhao, Yangjun
    Ye, Zhifeng
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [44] Preventive maintenance on welded connection joints in aged steel railway bridges
    Lin, Weiwei
    Yoda, Teruhiko
    Taniguchi, Nozomu
    Satake, Shinya
    Kasano, Hideyuki
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2014, 92 : 46 - 54
  • [45] Development of BrIM-Based Bridge Maintenance System for Existing Bridges
    Jeon, Chi-Ho
    Nguyen, Duy-Cuong
    Roh, Gitae
    Shim, Chang-Su
    BUILDINGS, 2023, 13 (09)
  • [46] Risk-informed optimisation of railway tracks inspection and maintenance procedures
    Podofillini, L
    Zio, E
    Vatn, J
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2006, 91 (01) : 20 - 35
  • [47] ON A NOVEL OPTIMISATION MODEL AND SOLUTION METHOD FOR TACTICAL RAILWAY MAINTENANCE PLANNING
    Heinicke, Franziska
    Simroth, Axel
    Tadei, Roberto
    ROAD AND RAIL INFRASTRUCTURE II, 2012, : 421 - 427
  • [48] Railway Bridges
    Geissler, Karsten
    STAHLBAU, 2015, 84 (03) : 161 - 161
  • [49] Railway Bridges
    Koch, Eckart
    STAHLBAU, 2017, 86 (12) : 1055 - 1055
  • [50] Railway Bridges
    Koch, Eckart
    STAHLBAU, 2019, 88 (02) : 87 - 87