Maintenance intervention optimisation for existing railway bridges

被引:0
|
作者
Nielsen, D. [1 ]
McSweeney, T. [1 ]
Raman, D. [1 ]
机构
[1] CQUniv Australia, Rockhampton, Qld, Australia
来源
BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION | 2014年
关键词
Life cycle costing; Bridges; Railway; Maintenance; Optimisation; Maintenance strategies; LIFETIME FUNCTIONS; EMPHASIS; COST;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Maintenance of aging infrastructure is a burden on many organisational budgets, and Life Cycle Cost Analysis (LCCA) is accepted as an effective method to reduce these costs. However, LCCA becomes extremely complex when applied at the individual bridge component level within a large bridge population while considering multiple maintenance strategies, varying deterioration rates and intervention intervals. To address this concern, a decision support model is presented that proposes maintenance actions for future interventions based on a selection of maintenance strategies and given organisational budget constraints. The remaining service life of surrounding components is considered when assessing the most appropriate maintenance actions. Three popular bridge management strategies are considered in this model, comprising refurbishment, upgrade and renewal strategies. The infrastructure manager may apply one of these three strategies at the bridge level to estimate future network budgets or align with existing budgets. The developed decision support application allows "what-if' scenarios to be generated to determine life cycle costs by changing life gained from maintenance actions, maintenance costs, maintenance strategy, discount rate, intervention trigger time and minimum intervention intervals.
引用
收藏
页码:2733 / 2740
页数:8
相关论文
共 50 条
  • [21] Cost analysis for maintenance and seismic retrofit of existing bridges
    Zanini, Mariano Angelo
    Faleschini, Flora
    Pellegrino, Carlo
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2016, 12 (11) : 1411 - 1427
  • [22] Maintenance schedule optimisation for a railway power supply system
    Chen, Shaokuan
    Ho, Tinkin
    Mao, Baohua
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (16) : 4896 - 4910
  • [23] Safety requirements and probabilistic models of resistance in the assessment of existing railway bridges
    Ramon Casas, Joan
    Wisniewski, Dawid
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2013, 9 (06) : 529 - 545
  • [24] Current status of existing railway bridges in Vietnam: An overview of steel deficiencies
    Hai, Dinh Tuan
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2006, 62 (10) : 987 - 994
  • [25] Simplified probabilistic non-linear assessment of existing railway bridges
    Wisniewski, Dawid F.
    Casas, Joan R.
    Ghosn, Michel
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2009, 5 (06) : 439 - 453
  • [26] Reliability-based assessment of existing masonry arch railway bridges
    Moreira, Vicente N.
    Fernandes, Joao
    Matos, Jose C.
    Oliveira, Daniel V.
    CONSTRUCTION AND BUILDING MATERIALS, 2016, 115 : 544 - 554
  • [27] Renovation of existing steel railway bridges: Field test and numerical simulation
    Lin, Weiwei
    Taniguchi, Nozomu
    Yoda, Teruhiko
    Hansaka, Masanori
    Satake, Shinya
    Sugino, Yusuke
    ADVANCES IN STRUCTURAL ENGINEERING, 2018, 21 (06) : 809 - 823
  • [28] Algorithm to Estimate the Capacity Reserve of Existing Masonry Arch Railway Bridges
    Brighenti, Francesca
    Possidente, Luca
    Zonta, Daniele
    APPLIED SCIENCES-BASEL, 2022, 12 (02):
  • [29] Methodology for the assessment of remaining fatigue life for existing welded railway bridges
    Petzek, E.
    Bancila, R.
    STEEL - A NEW AND TRADITIONAL MATERIAL FOR BUILDING, 2006, : 627 - +
  • [30] ESTIMATION OF THE CURRENT STRUCTURAL RELIABILITY LEVEL OF EXISTING RAILWAY BRIDGES AND VIADUCTS
    Rakoczy, Anna M.
    Jivan-coteti, Aleksandra
    ROADS AND BRIDGES-DROGI I MOSTY, 2021, 20 (03): : 289 - 309