Comparative life cycle assessment of tubular wind towers and foundations - Part 2: Life cycle analysis

被引:14
|
作者
Gervasio, H. [1 ]
Rebelo, C. [1 ]
Moura, A. [1 ]
Veljkovic, M. [2 ]
Simoes da Silva, L. [1 ]
机构
[1] Univ Coimbra, Dept Civil Engn, ISISE, P-3004516 Coimbra, Portugal
[2] Lulea Univ Technol, S-97187 Lulea, Sweden
关键词
Wind turbine; Concrete; Steel; Hybrid; Tower; Foundation; Life cycle; Environmental impact; TURBINE;
D O I
10.1016/j.engstruct.2014.02.041
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the first part of the paper the design of tubular towers and respective onshore foundations was addressed. The considered solutions were based on steel, concrete and hybrid steel-concrete tubular towers supporting multi-megawatt turbines of 2, 3.6 and 5 MW power with hub heights of 80, 100 and 150 m respectively. In this second part of the paper, the life cycle analysis of the designed case studies is performed and conclusions about their environmental impact are drawn. Two different scenarios concerning the lifetime of the towers were established. The first scenario considers 20 years lifetime and two different construction methods for the connection of the steel segments, the first based in current technology using flange connections and the second using newly developed friction connections. Assuming equal importance for all environmental categories in this scenario, it may be concluded that for heights up to 100 m hybrid towers with friction connections are the most efficient solution. For higher heights, the concrete tower becomes more efficient. The second scenario considers an increased total lifetime of 40 years, assuming the reuse of the tower after 20 years of operation. In this case, the use of friction connections in steel towers enhances the possibility of dismantling and reusing the tower potentiating much better performance in relation to the environmental category of global warming. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:292 / 299
页数:8
相关论文
共 50 条
  • [1] Comparative life cycle assessment of tubular wind towers and foundations - Part 1: Structural design
    Rebelo, C.
    Moura, A.
    Gervasio, H.
    Veljkovic, M.
    Simoes da Silva, L.
    [J]. ENGINEERING STRUCTURES, 2014, 74 : 283 - 291
  • [2] Life Cycle Analysis of lattice and tubular wind turbine towers. A comparative study
    Stavridou, N.
    Koltsakis, E.
    Baniotopoulos, C. C.
    [J]. SUSTAINABILITY IN THE BUILT ENVIRONMENT FOR CLIMATE CHANGE MITIGATION (SBE19), 2020, 410
  • [3] Life Cycle Assessment of Additively Manufactured Foundations for Ultratall Wind Turbine Towers
    Jones, Kathryn E. S.
    Li, Mo
    [J]. WIND ENERGY, 2024, : 1427 - 1449
  • [4] A comparative life-cycle analysis of tall onshore steel wind-turbine towers
    Stavridou, N.
    Koltsakis, E.
    Baniotopoulos, C. C.
    [J]. CLEAN ENERGY, 2020, 4 (01): : 48 - 57
  • [5] Life Cycle Assessment of Tall Onshore Hybrid Steel Wind Turbine Towers
    Gkantou, Michaela
    Rebelo, Carlos
    Baniotopoulos, Charalampos
    [J]. ENERGIES, 2020, 13 (15)
  • [6] Towards life-cycle assessment of foundations of guyed towers in electrical transmission lines
    Azevedo, C. B. P.
    Diniz, S. M. C.
    [J]. LIFE-CYCLE CIVIL ENGINEERING, 2008, : 703 - +
  • [7] Comparative life cycle assessment of 2.0 MW wind turbines
    [J]. Haapala, K.R. (karl.haapala@oregonstate.edu), 1600, Inderscience Enterprises Ltd., 29, route de Pre-Bois, Case Postale 856, CH-1215 Geneva 15, CH-1215, Switzerland (03):
  • [8] Comparative life cycle assessment and life cycle costing of lodging in the Himalaya
    Bhochhibhoya, Silu
    Pizzol, Massimo
    Achten, Wouter M. J.
    Maskey, Ramesh Kumar
    Zanetti, Michela
    Cavalli, Raffaele
    [J]. INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2017, 22 (11): : 1851 - 1863
  • [9] Comparative life cycle assessment and life cycle costing of lodging in the Himalaya
    Silu Bhochhibhoya
    Massimo Pizzol
    Wouter M. J. Achten
    Ramesh Kumar Maskey
    Michela Zanetti
    Raffaele Cavalli
    [J]. The International Journal of Life Cycle Assessment, 2017, 22 : 1851 - 1863
  • [10] Life cycle assessment and life cycle cost analysis of a 40 MW wind farm with consideration of the infrastructure
    Li, Qiangfeng
    Duan, Huabo
    Xie, Minghui
    Kang, Peng
    Ma, Yi
    Zhong, Ruoyu
    Gao, Tianming
    Zhong, Weiqiong
    Wen, Bojie
    Bai, Feng
    Vuppaladadiyam, Arun K.
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2021, 138