Towards life-cycle assessment of foundations of guyed towers in electrical transmission lines

被引:1
|
作者
Azevedo, C. B. P. [1 ]
Diniz, S. M. C. [1 ]
机构
[1] Univ Fed Minas Gerais, Belo Horizonte, MG, Brazil
关键词
D O I
10.1201/9780203885307.ch108
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Nowadays there has been a great interest in the use of probabilistic methods in problems related to electrical transmission lines. While different types of towers may be used along a transmission line, preference is usually given to guyed towers for its smaller weights and resulting smaller foundation costs. Due to the complex interaction soil-guy-tower, information on this subject is mostly obtained by experimental methods. In this work, experimental results are coupled to systems reliability techniques in the evaluation of failure probabilities of guyed towers foundations. These probabilities represent main ingredients in the estimation of risks associated with potential foundation failures. This is an important step towards the implementation of life cycle methods in the design, operation, and maintenance of electrical transmission lines.
引用
收藏
页码:703 / +
页数:2
相关论文
共 50 条
  • [1] Modeling guyed towers of transmission lines in the assessment of backflashover occurrence
    Almeida, Frederico S.
    Silveira, Fernando H.
    Visacro, Silverio
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2023, 223
  • [2] Life-cycle assessment of 11 kV electrical overhead lines and underground cables
    Jones, Craig I.
    McManus, Marcelle C.
    [J]. JOURNAL OF CLEANER PRODUCTION, 2010, 18 (14) : 1464 - 1477
  • [3] Dynamic response of transmission lines guyed towers under wind loading
    Gani, F.
    Legeron, F.
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2010, 37 (03) : 450 - 464
  • [4] Dynamic response due to cable rupture in a transmission lines guyed towers
    Carlos, Thiago B.
    Kaminski, Joao, Jr.
    [J]. X INTERNATIONAL CONFERENCE ON STRUCTURAL DYNAMICS (EURODYN 2017), 2017, 199 : 116 - 121
  • [5] Dynamic response of guyed towers in transmission lines submitted to broken conductors
    Bentes, Jennefer Lavor
    Ramos de Menezes, Ruy Carlos
    Riera, Jorge Daniel
    [J]. EURODYN 2014: IX INTERNATIONAL CONFERENCE ON STRUCTURAL DYNAMICS, 2014, : 3723 - 3730
  • [6] Comparative life cycle assessment of tubular wind towers and foundations - Part 2: Life cycle analysis
    Gervasio, H.
    Rebelo, C.
    Moura, A.
    Veljkovic, M.
    Simoes da Silva, L.
    [J]. ENGINEERING STRUCTURES, 2014, 74 : 292 - 299
  • [7] Life Cycle Assessment of Additively Manufactured Foundations for Ultratall Wind Turbine Towers
    Jones, Kathryn E. S.
    Li, Mo
    [J]. WIND ENERGY, 2024,
  • [8] Life-cycle assessment modelling and life-cycle assessment evaluation of a triboelement
    Wani, M. F.
    Anand, A.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART J-JOURNAL OF ENGINEERING TRIBOLOGY, 2010, 224 (J11) : 1209 - 1220
  • [9] LIFE-CYCLE ASSESSMENT
    WEISSMAN, AB
    [J]. ISSUES IN SCIENCE AND TECHNOLOGY, 1994, 11 (01) : 18 - 18
  • [10] Life-cycle assessment
    Harsch, M
    Schuckert, M
    Eyerer, P
    Saur, K
    [J]. ADVANCED MATERIALS & PROCESSES, 1996, 149 (06): : 43 - 46