Key Techniques for the Construction of High-Speed Railway Large-Section Loess Tunnels

被引:76
|
作者
Zhao, Yong [1 ]
He, Huawu [2 ]
Li, Pengfei [3 ]
机构
[1] China Railway Econ & Planning Res Inst, Beijing 100038, Peoples R China
[2] China Railway Corp, Beijing 100844, Peoples R China
[3] Beijing Univ Technol, Beijing 100124, Peoples R China
关键词
Loess tunnel; Surrounding rock classification; Surface cracking; Design load; Three-bench seven-step excavation method; EXCAVATION METHOD; PRESSURE; CHINA;
D O I
10.1016/j.eng.2017.07.003
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The successful completion of the Zhengzhou-Xi'an high-speed railway project has greatly improved the construction level of China's large-section loess tunnels, and has resulted in significant progress being made in both design theory and construction technology. This paper systematically summarizes the technical characteristics and main problems of the large-section loess tunnels on China's high-speed railway, including classification of the surrounding rock, design of the supporting structure, surface settlement and cracking control, and safe and rapid construction methods. On this basis, the key construction techniques of loess tunnels with large sections for high-speed railway are expounded from the aspects of design and construction. The research results show that the classification of loess strata surrounding large tunnels should be based on the geological age of the loess, and be determined by combining the plastic index and the water content. In addition, the influence of the buried depth should be considered. During tunnel excavation disturbance, if the tensile stress exceeds the soil tensile or shear strength, the surface part of the sliding trend plane can be damaged, and visible cracks can form. The pressure of the surrounding rock of a large-section loess tunnel should be calculated according to the buried depth, using the corresponding formula. A three-bench seven-step excavation method of construction was used as the core technology system to ensure the safe and rapid construction of a large-section loess tunnel, following a field test to optimize the construction parameters and determine the engineering measures to stabilize the tunnel face. The conclusions and methods presented here are of great significance in revealing the strata and supporting mechanics of large-section loess tunnels, and in optimizing the supporting structure design and the technical parameters for construction. (C) 2018 THE AUTHORS. Published by Elsevier LTD on behalf of Chinese Academy of Engineering and Higher Education Press Limited Company.
引用
收藏
页码:254 / 259
页数:6
相关论文
共 50 条
  • [1] Construction techniques for a large-section loess railway tunnel at the dividing line of loess and rock
    Huang, Bin
    [J]. Modern Tunnelling Technology, 2013, 50 (01) : 139 - 142
  • [2] Research on construction time of secondary lining of large section loess tunnel for high-speed railway
    Lu Jun-fu
    Wang Ming-nian
    Jia Yuan-yuan
    Yu Yu
    Tan Zhong-sheng
    [J]. ROCK AND SOIL MECHANICS, 2011, 32 (03) : 843 - 848
  • [3] Construction Stability Analysis and Field Monitoring of Shallowly Buried Large-Section Tunnels in Loess Strata
    Zheng, Fang
    Li, Wenqiang
    Song, Zhanping
    Wang, Jiahui
    Zhang, Yuwei
    Liu, Naifei
    Xiao, Kehui
    Wang, Yan
    [J]. WATER, 2024, 16 (15)
  • [4] Proxy Model Construction for Aerodynamic Effects of High-Speed Trains in Tunnels and Research on Optimization Method of Key Parameters of High-Speed Railway
    Zhang, Kexin
    Xu, Ning
    Cheng, Aijun
    [J]. 2022 IEEE 7TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION ENGINEERING, ICITE, 2022, : 134 - 139
  • [5] Deformation and structure strength anisotropy of undisturbed loess in tunnels on high-speed railway, China
    Wu, Xuyang
    Niu, Fujun
    Liang, Qingguo
    Li, Chunqing
    Lin, Zhanju
    [J]. TRANSPORTATION GEOTECHNICS, 2024, 44
  • [6] CHINA HIGH-SPEED RAILWAY BRIDGE CONSTRUCTION KEY TECHNOLOGIES
    Lei, Junqing
    Zhang, Kun
    Guo, Dongchen
    [J]. NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 699 - 704
  • [7] Structural Health Monitoring of Large-Section Tunnel of Jingxiong High-Speed Railway Based on Fiber Bragg Grating Monitoring Technology
    Wu Jinghong
    Ye Shaomin
    Zhang Jiqing
    Zhao Qing
    Zhang Wenxuan
    [J]. LASER & OPTOELECTRONICS PROGRESS, 2020, 57 (21)
  • [8] CONSTRUCTION WORKS OF LARGE-SECTION VERTICALLY PARALLEL TWIN TUNNELS IN CLOSE PROXIMITY
    Kuraji, Kentaro
    Morita, Masami
    Araki, Naoyuki
    Taniguchi, Yoshihir
    [J]. 2009 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 2009, : 1083 - 1101
  • [9] Structural response of existed metro tunnels to adjacent large-section pipe jacking construction
    Liu, Bo
    Zhang, Dingwen
    Fang, Lei
    [J]. PROCEEDINGS OF THE INTERNATIONAL SCIENTIFIC CONFERENCE TRANSPORTATION GEOTECHNICS AND GEOECOLOGY (TGG-2017), 2017, 189 : 11 - 17
  • [10] Aerodynamic loads to installations in high-speed railway tunnels
    Reiterer, Michael
    Schellander, Janez
    [J]. BAUTECHNIK, 2022, 99 (07) : 505 - 516