Key Techniques for the Construction of High-Speed Railway Large-Section Loess Tunnels

被引:76
|
作者
Zhao, Yong [1 ]
He, Huawu [2 ]
Li, Pengfei [3 ]
机构
[1] China Railway Econ & Planning Res Inst, Beijing 100038, Peoples R China
[2] China Railway Corp, Beijing 100844, Peoples R China
[3] Beijing Univ Technol, Beijing 100124, Peoples R China
关键词
Loess tunnel; Surrounding rock classification; Surface cracking; Design load; Three-bench seven-step excavation method; EXCAVATION METHOD; PRESSURE; CHINA;
D O I
10.1016/j.eng.2017.07.003
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The successful completion of the Zhengzhou-Xi'an high-speed railway project has greatly improved the construction level of China's large-section loess tunnels, and has resulted in significant progress being made in both design theory and construction technology. This paper systematically summarizes the technical characteristics and main problems of the large-section loess tunnels on China's high-speed railway, including classification of the surrounding rock, design of the supporting structure, surface settlement and cracking control, and safe and rapid construction methods. On this basis, the key construction techniques of loess tunnels with large sections for high-speed railway are expounded from the aspects of design and construction. The research results show that the classification of loess strata surrounding large tunnels should be based on the geological age of the loess, and be determined by combining the plastic index and the water content. In addition, the influence of the buried depth should be considered. During tunnel excavation disturbance, if the tensile stress exceeds the soil tensile or shear strength, the surface part of the sliding trend plane can be damaged, and visible cracks can form. The pressure of the surrounding rock of a large-section loess tunnel should be calculated according to the buried depth, using the corresponding formula. A three-bench seven-step excavation method of construction was used as the core technology system to ensure the safe and rapid construction of a large-section loess tunnel, following a field test to optimize the construction parameters and determine the engineering measures to stabilize the tunnel face. The conclusions and methods presented here are of great significance in revealing the strata and supporting mechanics of large-section loess tunnels, and in optimizing the supporting structure design and the technical parameters for construction. (C) 2018 THE AUTHORS. Published by Elsevier LTD on behalf of Chinese Academy of Engineering and Higher Education Press Limited Company.
引用
收藏
页码:254 / 259
页数:6
相关论文
共 50 条
  • [21] Deep Learning Method on Deformation Prediction for Large-Section Tunnels
    Xu, Wei
    Cheng, Ming
    Xu, Xiangyang
    Chen, Cheng
    Liu, Wei
    [J]. SYMMETRY-BASEL, 2022, 14 (10):
  • [22] Liner pressure in high-speed railway tunnels under high groundwater pressure
    Xin, Chunlei
    Gao, Bo
    [J]. Electronic Journal of Geotechnical Engineering, 2014, 19 I : 1863 - 1872
  • [23] Key technologies in high-speed railway turnout design
    Wang, Ping
    Chen, Rong
    Chen, Xiaoping
    [J]. Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2010, 45 (01): : 28 - 33
  • [24] Liner pressure in high-speed railway tunnels under high groundwater pressure
    [J]. 1863, E-Journal of Geotechnical Engineering (19):
  • [25] Use of the gyrotheodolite in underground networks of long high-speed railway tunnels
    Velasco-Gomez, J.
    Prieto, J. F.
    Molina, I.
    Herrero, T.
    Fabrega, J.
    Perez-Martin, E.
    [J]. SURVEY REVIEW, 2016, 48 (350) : 329 - 337
  • [26] Safety Distance of Shotcrete Subjected to Blasting Vibration in Large-Span High-Speed Railway Tunnels
    Li, Ao
    Zhang, Dingli
    Fang, Qian
    Luo, Jiwei
    Cao, Liqiang
    Sun, Zhenyu
    [J]. SHOCK AND VIBRATION, 2019, 2019
  • [27] Heat release rate of high-speed train fire in railway tunnels
    Zhou, Yuanlong
    Wang, Honglin
    Bi, Haiquan
    Liu, Xiaoxia
    Gou, Qilin
    [J]. Wang, Honglin (honglinwang305@hotmail.com), 1600, Elsevier Ltd (105):
  • [28] Heat release rate of high-speed train fire in railway tunnels
    Zhou, Yuanlong
    Wang, Honglin
    Bi, Haiquan
    Liu, Xiaoxia
    Gou, Qilin
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 105
  • [29] Ray optical modeling of wireless communications in high-speed railway tunnels
    Cichon, DJ
    Zwick, T
    Wiesbeck, W
    [J]. 1996 IEEE 46TH VEHICULAR TECHNOLOGY CONFERENCE, PROCEEDINGS, VOLS 1-3: MOBILE TECHNOLOGY FOR THE HUMAN RACE, 1996, : 546 - 550
  • [30] Construction work on the Narita new high-speed railway
    Matsuhashi, Sadao
    [J]. Japanese Railway Engineering, 2008, (160): : 9 - 11