共 50 条
- [41] Preliminary Research for Optimization of Gas-Steam Combined Cycle Cold-End [J]. ADVANCES IN POWER AND ELECTRICAL ENGINEERING, PTS 1 AND 2, 2013, 614-615 : 422 - +
- [42] Research on Metal Supervision and Inspection Standards for Gas-steam Combined Cycle Units [J]. 2020 INTERNATIONAL CONFERENCE ON CLIMATE CHANGE, GREEN ENERGY AND ENVIRONMENTAL SUSTAINABILITY (CCGEES 2020), 2021, 228
- [43] Performance assessment of a CAES system integrated into a gas-steam combined plant [J]. 4TH INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENT RESEARCH, ICEER 2017, 2017, 136 : 264 - 269
- [45] Thermoeconomic analysis and performance evaluation of gas-steam combined cycle power plant based on H&S model [J]. Chen, Jian-Hong (power@zju.edu.cn), 1600, Zhejiang University (50):
- [46] The Multi-Objective Optimization of the CCHP Driven By Gas-Steam Combined Cycle [J]. 2018 4TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND MATERIAL APPLICATION, 2019, 252
- [48] Analysis of gas-steam combined cycles with natural gas reforming and CO2 capture [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2005, 127 (03): : 545 - 552
- [50] A Performance Study of Coke Oven Gas Vehicle [J]. APPLIED ENERGY TECHNOLOGY, PTS 1 AND 2, 2013, 724-725 : 1201 - 1205