Thermoeconomic cost analysis and comparison of methodologies for Dora II binary geothermal power plant

被引:27
|
作者
Yilmaz, Ceyhun [1 ]
机构
[1] Afyon Kocatepe Univ, Dept Mech Engn, TR-03200 Afyon, Turkey
关键词
Geothermal power; Thermoeconomic analysis; SPECO; MOPSA; Moran method; EXERGOECONOMIC ANALYSIS; PERFORMANCE ANALYSIS; SYSTEM; TEMPERATURE; EXERGY; OPTIMIZATION; ENERGY;
D O I
10.1016/j.geothermics.2018.04.002
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Three thermoeconomic methodologies, specific exergy costing (SPECO), modified productive structure analysis (MOPSA) and the Moran, were used to compare cost flows and products interactions between system components in the context of an existing binary geothermal power plant in western Turkey. With the objective of identifying advantages and disadvantages, exergy and exergoeconomic analyses were conducted using actual plant data to evaluate plant performances and thermoeconomic costs. Overall energy and exergy efficiencies of the plant were calculated as 13.5% and 47.3% and unit exergetic electricity costs were determined as 0.0436 $/kWh for MOPSA, 0.0367 $/kWh for SPECO and 0.0355 $/kWh for Moran.
引用
收藏
页码:48 / 57
页数:10
相关论文
共 50 条
  • [21] Multiple regression analysis of performance parameters of a binary cycle geothermal power plant
    Karadas, Murat
    Celik, H. Murat
    Serpen, Umran
    Toksoy, Macit
    GEOTHERMICS, 2015, 54 : 68 - 75
  • [22] Thermoeconomic Analysis of Subcritical and Supercritical Isobutane Cycles for Geothermal Power Generation
    Arbula Blecich, Andrea
    Blecich, Paolo
    SUSTAINABILITY, 2023, 15 (11)
  • [23] Environmental assessment of a binary geothermal sourced power plant accompanied by exergy analysis
    Basogul, Yusuf
    ENERGY CONVERSION AND MANAGEMENT, 2019, 195 : 492 - 501
  • [24] Thermoeconomic appraisal of a novel power and hydrogen cogeneration plant with integration of biomass and geothermal energies
    Wang, Dan
    Ali, Masood Ashraf
    Alizadeh, As'ad
    Singh, Pradeep Kumar
    Almojil, Sattam Fahad
    Alali, Abdulrhman Fahmi
    Almoalimi, Khaled Twfiq
    Almohana, Abdulaziz Ibrahim
    INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2024, 52 : 385 - 400
  • [25] A BINARY-FLASHING GEOTHERMAL POWER-PLANT
    MICHAELIDES, EE
    SCOTT, GJ
    ENERGY, 1984, 9 (04) : 323 - 331
  • [26] Comparison of the effectiveness of geothermal energy utilisation in the case of a power plant with organic Rankine cycle and a hybrid binary plant
    Szczecin University of Technology, Department of Heat Engineering, Piastow 19, PL 70-310 Szczecin, Poland
    Arch. Thermodyn., 2008, 4 (133-140):
  • [27] Exergetic cost evaluation of hydrogen production powered by combined flash-binary geothermal power plant
    Yilmaz, Ceyhun
    Kanoglu, Mehmet
    Abusoglu, Aysegul
    INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2015, 40 (40) : 14021 - 14030
  • [28] Thermo-economic analysis of a hybrid solar-binary geothermal power plant
    Ayub, Mohammad
    Mitsos, Alexander
    Ghasemi, Hadi
    ENERGY, 2015, 87 : 326 - 335
  • [29] Thermodynamic and economic analysis for the pre-feasibility study of a binary geothermal power plant
    Budisulistyo, Denny
    Krumdieck, Susan
    ENERGY CONVERSION AND MANAGEMENT, 2015, 103 : 639 - 649
  • [30] ANALYSIS OF THE THERMODYNAMIC PERFORMANCE OF KALINA CYCLE SYSTEM 11 (KCS11) FOR GEOTHERMAL POWER PLANT - COMPARISON WITH KAWERAU ORMAT BINARY PLANT
    Lu, Xinli
    Watson, Arnold
    Deans, Joe
    ES2009: PROCEEDINGS OF THE ASME 3RD INTERNATIONAL CONFERENCE ON ENERGY SUSTAINABILITY, VOL 1, 2009, : 357 - 358