Construction Procurement in Industrialised Building System

被引:1
|
作者
Ahamad, Nurulhuda Binti [1 ]
Mazlan, Ain Naadia Binti [2 ]
Zin, Rosli Mohamad [2 ]
Tukirin, Siti Asiah [3 ]
机构
[1] INTI Int Univ, Fac Engn & Quant Surveying, Dept Quant Surveying, Nilai 71800, Negeri Sembilan, Malaysia
[2] Univ Teknol Malaysia, Fac Engn, Sch Civil Engn, Johor Baharu 81310, Johor, Malaysia
[3] Univ Teknol Malaysia, UTM Construct Res Ctr, Johor Baharu 81310, Johor, Malaysia
关键词
Industrialised Building system (IBS); procurement process; integration; Malaysia Construction Industry;
D O I
10.1088/1757-899X/849/1/012072
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The government, through CIDB Malaysia have continuously promoting Industrialised Building System (IBS) to increase the immense efficiency of the building performance structure. However, the level of IBS adoption among the construction players in Malaysia is still low and far from the government expectation. It is evident that most of the IBS projects developments in Malaysia are still conducted by using the conventional procurement method. This creates a number of issues such as reworks, time delay, rising cost, lack of communication and integration problem. Thus, this paper will identify existing procurement process used for IBS projects in Malaysia construction industry. Identifying existing procurement process helps in providing significant elements before creation of a more effective new procurement for IBS projects in Malaysia. Expert interviews was used, whereby 5 (five) interviews sessions were conducted with IBS experts in Malaysia construction industry. Thematic analysis was utilised to analyse the interview result by identifying the existing procurement process adopted in current IBS projects. Findings from expert interviews showed that there are three different procurement process commonly applied in current IBS projects. Result also shown that one of the significant barriers to IBS adoption is the current practice of procurement and team integration. Therefore, a more effective new procurement for IBS projects should be considered and pursued urgently in order to improve IBS implementation in the Malaysian construction industry.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] Carbon footprint of construction using industrialised building system
    Lim, P. Y.
    Yahya, K.
    Aminudin, E.
    Zakaria, R.
    Haron, Z.
    Zin, R. Mohamad
    Redzuan, A. A. H.
    [J]. GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271
  • [2] ISSUES OF PAYMENT PROCUREMENT PROCESS FOR INDUSTRIALISED BUILDING SYSTEM (IBS) PROJECT
    Dzulkalnine, Natasha
    Azman, Mohamed Nor Azhari
    Bing, Khuan Wai
    Habidin, Nurul Fadly
    Ayub, Abdul Rahman
    [J]. JURNAL TEKNOLOGI, 2016, 78 (5-10): : 11 - 15
  • [3] Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS)
    Ariffin, Hamizah Liyana Tajul
    Mohd, Norhazren Izatie
    Mustaffa, Nur Emma
    Bandi, Shamsulhadi
    Chee, Cecelia Ho Mei
    [J]. INTERNATIONAL JOURNAL OF BUILT ENVIRONMENT AND SUSTAINABILITY, 2019, 6 (01): : 39 - 43
  • [4] The Insight of Industrialised Building System (IBS) By Bumiputera Construction Players
    Muhammad, W. M. N. W.
    Azman, M. A.
    Othman, M. K. F.
    Hadi, N. A.
    Sahimi, S. N. S.
    Mohammad, M. F.
    [J]. 3RD INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING FOR SUSTAINABILITY (ICONCEES 2015), 2016, 47
  • [5] An Explanation for the Adoption of Industrialised Building Construction in Malaysia: System Functions
    Sazalli, Saiful Azri Abu Hasan
    Greenwood, David
    Morton, David
    Agnew, Brian
    [J]. PROCEEDINGS OF THE 7TH EUROPEAN CONFERENCE ON INNOVATION AND ENTREPRENEURSHIP, VOLS 1 AND 2, 2012, : 872 - 881
  • [6] Effective of Communication using WhatsApp: Industrialised Building System (IBS) Construction
    Pozin, Mohd Affendi Ahmad
    Nawi, Mohd Nasrun Mohd
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON APPLIED SCIENCE AND TECHNOLOGY (ICAST'18), 2018, 2016
  • [7] A PROJECT MANAGEMENT COMPETENCY FRAMEWORK FOR INDUSTRIALISED BUILDING SYSTEM (IBS) CONSTRUCTION
    Jabar, Izatul Laili
    Abdul-Aziz, Abdul-Rashid
    Suresh, Subashini
    Renukappa, Suresh
    Enshassi, Adnan
    [J]. INTERNATIONAL JOURNAL OF TECHNOLOGY, 2019, 10 (04) : 657 - 666
  • [8] Factors Influencing the Construction Cost of Industrialised Building System (IBS) Projects
    Bari, Nor Azmi Ahmad
    Yusuff, Rosnah
    Ismail, Napsiah
    Jaapar, Aini
    Ahmad, Norizan
    [J]. AICE-BS 2011 FAMAGUSTA (ASIA PACIFIC INTERNATIONAL CONFERENCE ON ENVIRONMENT-BEHAVIOUR STUDIES), 2012, 35 : 689 - 696
  • [9] The Communication in Industrialised Building System (IBS) Construction Project: Virtual Environment
    Pozin, Mohd Affendi Ahmad
    Nawi, Mohd Nasrun Mohd
    [J]. 2ND INTERNATIONAL CONFERENCE ON APPLIED SCIENCE AND TECHNOLOGY 2017 (ICAST'17), 2017, 1891
  • [10] Investigation of Industrialised Building System Performance in Comparison to Conventional Construction Method
    Mydin, M. A. Othuman
    Sani, N. Md
    Phius, A. F.
    [J]. BUILDING SURVEYING AND TECHNOLOGY UNDERGRADUATE CONFERENCE, 2014, 10