Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS)

被引:7
|
作者
Ariffin, Hamizah Liyana Tajul [1 ]
Mohd, Norhazren Izatie [1 ]
Mustaffa, Nur Emma [1 ]
Bandi, Shamsulhadi [1 ]
Chee, Cecelia Ho Mei [1 ]
机构
[1] Univ Teknol Malaysia, Fac Built Environm & Surveying, Dept Quant Surveying, Utm Johor Bahru 81310, Johor, Malaysia
关键词
IBS; Traditional procurement method; Issues; Client's perspective; Innovative procurement; CRITICAL SUCCESS FACTORS;
D O I
10.11113/ijbes.v6.n1.328
中图分类号
TU98 [区域规划、城乡规划];
学科分类号
0814 ; 082803 ; 0833 ;
摘要
Malaysia is making an aggressive effort of transformation to become a fully developed country. As one of the pillars for transformation, the construction industry has been undergoing a major reform with regard to the traditional method of construction. In recent years, the Industrialised Building System (IBS) has been promoted extensively with the government taking a lead with the practice. Studies showed that IBS has been able to expedite construction process, improve the time taken to accomplish a project, improve building quality, able to control cost and human resources, which in overall, raise occupational health and safety standard of construction. Despite, as most IBS projects were carried out under the traditional procurement method, the full benefits of IBS are somehow obscured. Several issues such as work delay, lack of communication and integration, lack of knowledge and increase in cost, which are synonymous to the traditional procurement method appear to outweigh the benefit of IBS. Hence, this research aims to suggest an alternative to the traditional procurement method with regard to IBS project implementation. The focus of this research has been on the challenges and innovative procurement methods most suited for IBS project. Two objectives were outlined: (1) to identify issues faced by client on current procurement method in IBS project; and (2) to identify the client's perspective on innovative procurement method most suited for IBS project. Data for this research was collected through semi-structured interviews with five respondents from five major developers having experience in IBS project implementation. The results from the thematic analysis revealed that apart from the common issues which ascend from the sequential nature of the traditional procurement method, design integration issue was opined to aggravate the situation. Unanimously, respondents agreed that partnering is the way forward for IBS project implementation in Malaysian construction industry. This research contributes by providing important pointers for the local construction industry to move forward with IBS project implementation.
引用
收藏
页码:39 / 43
页数:5
相关论文
共 50 条
  • [1] ISSUES OF PAYMENT PROCUREMENT PROCESS FOR INDUSTRIALISED BUILDING SYSTEM (IBS) PROJECT
    Dzulkalnine, Natasha
    Azman, Mohamed Nor Azhari
    Bing, Khuan Wai
    Habidin, Nurul Fadly
    Ayub, Abdul Rahman
    [J]. JURNAL TEKNOLOGI, 2016, 78 (5-10): : 11 - 15
  • [2] AN INTEGRATED APPROACH FOR SUSTAINABILITY IN THE APPLICATION OF INDUSTRIALISED BUILDING SYSTEM (IBS)
    Yunus, Riduan
    Hamid, Abdul Rahim Abdul
    Noor, Siti Rahimah Mohd
    [J]. INTERNATIONAL JOURNAL OF GEOMATE, 2019, 17 (61): : 115 - 121
  • [3] Construction Procurement in Industrialised Building System
    Ahamad, Nurulhuda Binti
    Mazlan, Ain Naadia Binti
    Zin, Rosli Mohamad
    Tukirin, Siti Asiah
    [J]. 4TH INTERNATIONAL CONFERENCE ON CONSTRUCTION AND BUILDING ENGINEERING & 12TH REGIONAL CONFERENCE IN CIVIL ENGINEERING (ICONBUILD & RCCE 2019), 2020, 849
  • [4] Critical Success Factors for Lean Thinking in the Application of Industrialised Building System (IBS)
    Yunus, Riduan
    Noor, Siti Rahimah Mohd
    Abdullah, Abd Halid
    Nagapan, Sasitharan
    Hamid, Abdul Rahim Abdul
    Tajudin, Saiful Azhar Ahmad
    Jusof, Siti Rohani Mat
    [J]. INTERNATIONAL RESEARCH AND INNOVATION SUMMIT (IRIS2017), 2017, 226
  • [5] Advanced Industrialised Building System (IBS) Initiative Model
    Amar, Nur Zalikha Mohd
    Ismail, Zulhabri
    Sahab, Siti Suhaidah
    [J]. IEEE SYMPOSIUM ON BUSINESS, ENGINEERING AND INDUSTRIAL APPLICATIONS (ISBEIA 2012), 2012, : 673 - 677
  • [6] Flexibility of Supply Chain in Industrialised Building System (IBS)
    Kassim, U.
    Abdullah, S.
    Udin, Z.
    [J]. BUILDING SURVEYING, FACILITIES MANAGEMENT AND ENGINEERING CONFERENCE (BSFMEC 2014), 2014, 15
  • [7] Opening the pandora's box of issues in the Industrialised Building System (IBS) in Malaysia: A thematic review
    Zairul, Mohd
    [J]. JOURNAL OF APPLIED SCIENCE AND ENGINEERING, 2022, 25 (02): : 297 - +
  • [8] The Contractors' Perception of the Implementation of Industrialised Building System (IBS) in Malaysia
    Razak, F. Md
    Awang, H.
    [J]. BUILDING SURVEYING AND TECHNOLOGY UNDERGRADUATE CONFERENCE, 2014, 10
  • [9] Key Factors of Readiness in the Implementation of Industrialised Building System (IBS)
    Tamrin, Norhidayah
    Nawi, Mohd Nasrun Mohd
    Nifa, Faizatul Akmar Abdul
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON APPLIED SCIENCE AND TECHNOLOGY 2016 (ICAST '16), 2016, 1761
  • [10] Case Studies on Sustainability Factors for Industrialised Building System (IBS)
    Yunus, Riduan
    Handan, Rabitah
    Riazi, Salman Riazi Mehdi
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (02): : 65 - 71