Construction Procurement in Industrialised Building System

被引:1
|
作者
Ahamad, Nurulhuda Binti [1 ]
Mazlan, Ain Naadia Binti [2 ]
Zin, Rosli Mohamad [2 ]
Tukirin, Siti Asiah [3 ]
机构
[1] INTI Int Univ, Fac Engn & Quant Surveying, Dept Quant Surveying, Nilai 71800, Negeri Sembilan, Malaysia
[2] Univ Teknol Malaysia, Fac Engn, Sch Civil Engn, Johor Baharu 81310, Johor, Malaysia
[3] Univ Teknol Malaysia, UTM Construct Res Ctr, Johor Baharu 81310, Johor, Malaysia
关键词
Industrialised Building system (IBS); procurement process; integration; Malaysia Construction Industry;
D O I
10.1088/1757-899X/849/1/012072
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The government, through CIDB Malaysia have continuously promoting Industrialised Building System (IBS) to increase the immense efficiency of the building performance structure. However, the level of IBS adoption among the construction players in Malaysia is still low and far from the government expectation. It is evident that most of the IBS projects developments in Malaysia are still conducted by using the conventional procurement method. This creates a number of issues such as reworks, time delay, rising cost, lack of communication and integration problem. Thus, this paper will identify existing procurement process used for IBS projects in Malaysia construction industry. Identifying existing procurement process helps in providing significant elements before creation of a more effective new procurement for IBS projects in Malaysia. Expert interviews was used, whereby 5 (five) interviews sessions were conducted with IBS experts in Malaysia construction industry. Thematic analysis was utilised to analyse the interview result by identifying the existing procurement process adopted in current IBS projects. Findings from expert interviews showed that there are three different procurement process commonly applied in current IBS projects. Result also shown that one of the significant barriers to IBS adoption is the current practice of procurement and team integration. Therefore, a more effective new procurement for IBS projects should be considered and pursued urgently in order to improve IBS implementation in the Malaysian construction industry.
引用
收藏
页数:7
相关论文
共 50 条
  • [31] A Review on Prefab Industrialised Building System Modular Construction in Malaysia: The Perspective of Non-structural Studies
    Chai, Teck Jung
    Tan, Cher Siang
    Chow, Tio Kiong
    Ling, Philip Chie Hui
    Koh, Heng Boon
    [J]. ADVANCES IN CIVIL ENGINEERING MATERIALS (ICACE 2018), 2019, 19 : 11 - 21
  • [32] A review on the current issues and barriers of Industrialised Building System (IBS) adoption in Malaysia's construction industry
    Amin, M. A. Mohd
    Abas, N. H.
    Shahidan, S.
    Rahmat, M. H.
    Suhaini, N. A.
    Nagapan, S.
    Rahim, R. Abdul
    [J]. GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271
  • [33] Enhancing the Quality of Life by Adopting Sustainable Modular Industrialised Building System (IBS) in the Malaysian Construction Industry
    Musa, Muhamad Faiz
    Mohammad, Mohammad Fadhil
    Mahbub, Rohana
    Yusof, Mohd Reeza
    [J]. AMER INTERNATIONAL CONFERENCE ON QUALITY OF LIFE, AICQOL2014, 2014, 153 : 79 - 89
  • [34] Appraising the use of labour-only procurement system for building construction in Nigeria
    Akinkunmi, Olutayo Gabriel
    Aghimien, Douglas Omoregie
    Awodele, Oluwaseyi Alabi
    [J]. ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2018, 10 (01): : 1719 - 1726
  • [35] Construction performance comparison between conventional and industrialised building systems in Malaysia
    Housing Research Centre, Faculty of Engineering, Universiti Putra Malaysia, Serdang, Malaysia
    不详
    不详
    不详
    [J]. Struct. Surv., 2006, 5 (412-424):
  • [36] Carbon Footprint Analysis of Industrialised Building System in Malaysia
    Lip, Yih Yoong
    Teo, Fang Yenn
    Tang, Ioannes Yu Hoe
    [J]. PROCEEDINGS OF AICCE'19: TRANSFORMING THE NATION FOR A SUSTAINABLE TOMORROW, 2020, 53 : 817 - 825
  • [37] Procurement routes in public building and construction projects
    Lædre, O
    Austeng, K
    Haugen, TI
    Klakegg, OJ
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2006, 132 (07): : 689 - 696
  • [38] Sustainable Public Procurement in the Building Construction Sector
    Fregonara, Elena
    Ferrando, Diego Giuseppe
    Tulliani, Jean-Marc
    [J]. SUSTAINABILITY, 2022, 14 (18)
  • [39] Flexibility of Supply Chain in Industrialised Building System (IBS)
    Kassim, U.
    Abdullah, S.
    Udin, Z.
    [J]. BUILDING SURVEYING, FACILITIES MANAGEMENT AND ENGINEERING CONFERENCE (BSFMEC 2014), 2014, 15
  • [40] Critical Success Factors Influencing Total Quality Management In Industrialised Building System: A Case Of Malaysian Construction Industry
    Alawag, Aawag Mohsen
    Alaloul, Wesam Salah
    Liew, M. S.
    Musarat, Muhammad Ali
    Baarimah, Abdullah O.
    Saad, Syed
    Ammad, Syed
    [J]. AIN SHAMS ENGINEERING JOURNAL, 2023, 14 (02)