Risk Assessment of Innovative Projects Based on Fuzzy Modeling

被引:1
|
作者
Samokhvalov, Yuri [1 ]
机构
[1] Taras Shevchenko Natl Univ Kyiv, 64 Volodymyrska St, UA-01033 Kiev, Ukraine
关键词
Innovative project; Risk; Net present value; Fuzzy sets; Linguistic assessment; Membership function; The Monte Carlo method;
D O I
10.1007/978-3-030-54215-3_17
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This article is devoted to the consideration of innovative risk assessment approach. The approach includes two stages. At the first stage, as a result of fuzzy network modeling, based on fuzzy linguistic assessments of duration and cost of the job, the size of initial investments and the projected duration of the initial period of the innovative process, using beta-distribution, are determined. On the second, random scenarios are simulated and the possible risk is calculated. This procedure combines fuzzy estimates and the Monte Carlo simulation. Fuzzy estimates of the model parameters of possible results allow us to take into account the uncertainty of the initial information in the process of simulating random values. In this case, for modeling random variables, the Gauss membership function is used, which determines the distribution of expectations of input variables.
引用
收藏
页码:265 / 281
页数:17
相关论文
共 50 条
  • [21] Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
    Taylan, Osman
    Bafail, Abdallah O.
    Abdulaal, Reda M. S.
    Kabli, Mohammed R.
    [J]. APPLIED SOFT COMPUTING, 2014, 17 : 105 - 116
  • [22] Structural equation modeling and Fuzzy set theory: Advancing risk assessment in oil and gas construction projects
    Al-Mhdawi, M. K. S.
    O'Connor, Alan
    Qazi, Abroon
    [J]. ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2024, 109
  • [23] An application of fuzzy BWM for risk assessment in offshore oil projects
    Ketabchi, Reza
    Ghaeli, M. R.
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (03) : 233 - 240
  • [24] Risk Assessment of Software Projects Using Fuzzy Inference System
    Iranmanesh, Seyed Hossein
    Khodadadi, Seyed Behrouz
    Taheri, Shakib
    [J]. CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 1149 - +
  • [25] Risk assessment of RD projects: A new approach based on IVIF AHP and fuzzy axiomatic design
    Ilbahar, Esra
    Cebi, Selcuk
    Kahraman, Cengiz
    [J]. Journal of Intelligent and Fuzzy Systems, 2022, 42 (01): : 605 - 614
  • [26] Risk assessment on offshore photovoltaic power generation projects in China based on a fuzzy analysis framework
    Wu, Yunna
    Li, Lingwenying
    Song, Zixin
    Lin, Xiaoshan
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 215 : 46 - 62
  • [27] Fuzzy comprehensive Bayesian network-based safety risk assessment for metro construction projects
    Wang, Z. Z.
    Chen, C.
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 70 : 330 - 342
  • [28] Social Risk Assessment and Management for Major Construction Projects in China Based on Fuzzy Integrated Analysis
    Miao, Junxia
    Huang, Dechun
    He, Zhengqi
    [J]. COMPLEXITY, 2019, 2019
  • [29] CONSTRUCTION PROJECTS RISK ASSESSMENT BASED ON PERT, CPM AND PROJECT MANAGEMENT WITH FUZZY LOGIC TECHNIQUE
    Soni, Akash
    Kumar, Ramesh
    Shrivastava, Amit
    [J]. ADVANCES AND APPLICATIONS IN MATHEMATICAL SCIENCES, 2022, 21 (09): : 5385 - 5395
  • [30] Risk Evaluation of Investment Projects Based on Fuzzy Theory
    An Ya-Qin
    Wang Ya-Jun
    He Song-Bai
    [J]. EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 4289 - 4292