An application of fuzzy BWM for risk assessment in offshore oil projects

被引:9
|
作者
Ketabchi, Reza [1 ]
Ghaeli, M. R. [1 ]
机构
[1] New York Inst Technol, Sch Management, 1700-701 W Georgia St, Vancouver, BC V7Y 1K8, Canada
关键词
Project management; Risk assessment; Offshore oil projects; PRICE RISK; MANAGEMENT;
D O I
10.5267/j.jpm.2019.3.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The purpose of this paper is to examine the existing risks for the offshore project and risk weighting using the fuzzy best worst method (FBWM). In offshore oil projects, we face six major risks. Each of these risks is divided into smaller risks leaving us to have a total of 34 risks. Some of these risks are internal and some are external risks. In this method, first, the experts of this field determined the best and the worst type of risk. Then, using the experts' opinions, the study compared the remaining risks with the two selected risks and the other weights are determined. In our survey, "Technical Risk and Project Execution" is the most important risk factor followed by "Political Risk and Sanctions", "Market risk", "Management risk", "Financial risk and currency fluctuations" and "Environmental risk". (C) 2019 by the authors; licensee Growing Science, Canada.
引用
收藏
页码:233 / 240
页数:8
相关论文
共 50 条
  • [1] Fuzzy risk assessment of oil and gas offshore wells
    Lavasani, S. M. Miri
    Yang, Z.
    Finlay, J.
    Wang, J.
    [J]. PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2011, 89 (05) : 277 - 294
  • [2] A new risk assessment framework for safety in oil and gas industry: Application of FMEA and BWM based picture fuzzy MABAC
    Aydin, Nezir
    Seker, Sukran
    Sen, Ceyda
    [J]. JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2022, 219
  • [3] Application of fuzzy logic for risk assessment of investment projects
    Aliyev, E. A.
    Gabibov, I. A.
    Ismailova, R. A.
    Huseynov, R. O.
    [J]. SOCAR PROCEEDINGS, 2022, 2022 : 93 - 99
  • [4] Application of fuzzy logic for risk assessment of investment projects
    Rachkevych, R.V.
    Chudyk, I.I.
    Rachkevych, I.А.
    Ahmed, Al-Tanakchi
    [J]. SOCAR Proceedings, 2022, 2022 : 1 - 8
  • [5] FUZZY ECONOMIC ASSESSMENT FOR OFFSHORE OIL FIELDS
    Lin Shaopei
    [J]. China Ocean Engineering, 1990, (01) : 97 - 108
  • [6] Application of a Fuzzy AHP Method to Risk Assessment of International Construction Projects
    Chen, Peihong
    Wang, Jiaqiong
    [J]. ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, : 459 - +
  • [7] Risk assessment on offshore photovoltaic power generation projects in China based on a fuzzy analysis framework
    Wu, Yunna
    Li, Lingwenying
    Song, Zixin
    Lin, Xiaoshan
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 215 : 46 - 62
  • [8] Development and application of oil-spill risk assessment model for offshore pipeline
    Yan Lu
    Jia Wang
    Wenpu Wei
    Yong Yang
    Wei An
    [J]. Journal of Ocean University of China, 2014, 13 : 415 - 420
  • [9] Development and application of oil-spill risk assessment model for offshore pipeline
    Lu Yan
    Wang Jia
    Wei Wenpu
    Yang Yong
    An Wei
    [J]. JOURNAL OF OCEAN UNIVERSITY OF CHINA, 2014, 13 (03) : 415 - 420
  • [10] Development and Application of Oil-Spill Risk Assessment Model for Offshore Pipeline
    LU Yan
    WANG Jia
    WEI Wenpu
    YANG Yong
    AN Wei
    [J]. Journal of Ocean University of China, 2014, 13 (03) : 415 - 420