An application of fuzzy BWM for risk assessment in offshore oil projects

被引:9
|
作者
Ketabchi, Reza [1 ]
Ghaeli, M. R. [1 ]
机构
[1] New York Inst Technol, Sch Management, 1700-701 W Georgia St, Vancouver, BC V7Y 1K8, Canada
关键词
Project management; Risk assessment; Offshore oil projects; PRICE RISK; MANAGEMENT;
D O I
10.5267/j.jpm.2019.3.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The purpose of this paper is to examine the existing risks for the offshore project and risk weighting using the fuzzy best worst method (FBWM). In offshore oil projects, we face six major risks. Each of these risks is divided into smaller risks leaving us to have a total of 34 risks. Some of these risks are internal and some are external risks. In this method, first, the experts of this field determined the best and the worst type of risk. Then, using the experts' opinions, the study compared the remaining risks with the two selected risks and the other weights are determined. In our survey, "Technical Risk and Project Execution" is the most important risk factor followed by "Political Risk and Sanctions", "Market risk", "Management risk", "Financial risk and currency fluctuations" and "Environmental risk". (C) 2019 by the authors; licensee Growing Science, Canada.
引用
收藏
页码:233 / 240
页数:8
相关论文
共 50 条
  • [41] ROLE OF THE CONSULTANT IN OFFSHORE OIL INDUSTRY PROJECTS
    HEAD, JF
    [J]. IEE PROCEEDINGS-A-SCIENCE MEASUREMENT AND TECHNOLOGY, 1984, 131 (06): : 397 - 405
  • [42] A Scoring Model to Evaluate Offshore Oil Projects
    Giadedi, Abdulhakim
    Daim, Tugrul U.
    [J]. ENGINEERING MANAGEMENT JOURNAL, 2022, 34 (03) : 436 - 449
  • [43] Approaches to Assessing the Strategic Sustainability of High-Risk Offshore Oil and Gas Projects
    Cherepovitsyn, Alexey
    Tsvetkova, Anna
    Komendantova, Nadejda
    [J]. JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2020, 8 (12) : 1 - 31
  • [44] Probabilistic risk assessment of oil spill from offshore oil wells in Persian Gulf
    Amir-Heidari, Payam
    Raie, Mohammad
    [J]. MARINE POLLUTION BULLETIN, 2018, 136 : 291 - 299
  • [45] Application of fuzzy logic to explosion risk assessment
    Markowski, Adam S.
    Mannan, M. Sam
    Kotynia, Agata
    Pawlak, Henryk
    [J]. JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2011, 24 (06) : 780 - 790
  • [46] Risk assessment of avalanches - A fuzzy GIS application
    Hemetsberger, M
    Klinger, G
    Niederer, S
    Benedikt, J
    [J]. COMPUTATIONAL INTELLIGENT SYSTEMS FOR APPLIED RESEARCH, 2002, : 395 - 402
  • [47] Application of a fuzzy-logic based model for risk assessment in additive manufacturing R&D projects
    Maria Moreno-Cabezali, Belen
    Fernandez-Crehuet, Jose Maria
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 145
  • [48] Lifecycle risk assessment on the sustainable development of upgrading energy projects using abandoned mines: An ISM-BWM method
    He, Jiaming
    Wu, Yunna
    Yong, Xingkai
    Ke, Yiming
    Tan, Qinliang
    Liu, Fangtong
    [J]. SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2022, 54
  • [49] A Fuzzy-Bayesian Model for Risk Assessment in Power Plant Projects
    Islam, Muhammad Saiful
    Nepal, Madhav
    [J]. INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERIS/PROJMAN / HCIST 2016, 2016, 100 : 963 - 970
  • [50] Fuzzy Logic Driven Expert System for the Assessment of Software Projects Risk
    Ibraigheeth, Mohammad Ahmad
    Fadzli, Syed Abdullah
    [J]. INTERNATIONAL JOURNAL OF ADVANCED COMPUTER SCIENCE AND APPLICATIONS, 2019, 10 (02) : 153 - 158