Risk Assessment of Innovative Projects Based on Fuzzy Modeling

被引:1
|
作者
Samokhvalov, Yuri [1 ]
机构
[1] Taras Shevchenko Natl Univ Kyiv, 64 Volodymyrska St, UA-01033 Kiev, Ukraine
关键词
Innovative project; Risk; Net present value; Fuzzy sets; Linguistic assessment; Membership function; The Monte Carlo method;
D O I
10.1007/978-3-030-54215-3_17
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This article is devoted to the consideration of innovative risk assessment approach. The approach includes two stages. At the first stage, as a result of fuzzy network modeling, based on fuzzy linguistic assessments of duration and cost of the job, the size of initial investments and the projected duration of the initial period of the innovative process, using beta-distribution, are determined. On the second, random scenarios are simulated and the possible risk is calculated. This procedure combines fuzzy estimates and the Monte Carlo simulation. Fuzzy estimates of the model parameters of possible results allow us to take into account the uncertainty of the initial information in the process of simulating random values. In this case, for modeling random variables, the Gauss membership function is used, which determines the distribution of expectations of input variables.
引用
收藏
页码:265 / 281
页数:17
相关论文
共 50 条
  • [1] INNOVATIVE APPROACH BASED ON FUZZY MODELING FOR ECOSYSTEMS ASSESSMENT
    Marius, Pislaru
    Silvia, Avasilcai
    Lidia, Alexa
    [J]. ENERGY AND CLEAN TECHNOLOGIES CONFERENCE PROCEEDINGS, SGEM 2016, VOL III, 2016, : 137 - 144
  • [2] Construction Projects Risk Assessment based on Fuzzy AHP
    Gohar, A. Sotoodeh
    Khanzadi, M.
    Jalal, M. Parchami
    Javid, A. A. Shirzadi
    [J]. 2009 IEEE STUDENT CONFERENCE ON RESEARCH AND DEVELOPMENT: SCORED 2009, PROCEEDINGS, 2009, : 570 - 573
  • [3] RISK ASSESSMENT OF THE INNOVATIVE PROJECTS IMPLEMENTATION
    Deptula, Anna Malgorzata
    Knosala, Ryszard
    [J]. MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2015, 6 (04) : 15 - 25
  • [4] Fuzzy-Based Multivariate Analysis for Input Modeling of Risk Assessment in Wind Farm Projects
    Mohamed, Emad
    Jafari, Parinaz
    AbouRizk, Simaan
    [J]. ALGORITHMS, 2020, 13 (12)
  • [5] Risk Assessment in the Economic Analysis of Innovative Projects
    Nikolenko T.Y.
    Semina L.V.
    [J]. Russian Engineering Research, 2022, 42 (4) : 430 - 433
  • [6] System with probabilistic fuzzy knowledge base and parametric inference operators in risk assessment of innovative projects
    Rudnik, Katarzyna
    Deptula, Anna Malgorzata
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (17-18) : 6365 - 6379
  • [7] Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects
    Li, Jie
    Zou, Patrick X. W.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (12): : 1205 - 1209
  • [8] FUZZY APPROACH USING EXPERTS' PSYCHOLOGICAL CONDITIONS TO ESTIMATE THE CRITERIA IMPORTANCE FOR THE ASSESSMENT OF INNOVATIVE PROJECTS RISK
    Deptula, Anna Malgorzata
    Rudnik, Katarzyna
    [J]. MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2018, 9 (01) : 13 - 23
  • [9] Application of fuzzy logic for risk assessment of investment projects
    Aliyev, E. A.
    Gabibov, I. A.
    Ismailova, R. A.
    Huseynov, R. O.
    [J]. SOCAR PROCEEDINGS, 2022, : 93 - 99
  • [10] A REVIEW OF FUZZY RISK ASSESSMENT MODELS FOR CONSTRUCTION PROJECTS
    Rezakhani, P.
    [J]. SLOVAK JOURNAL OF CIVIL ENGINEERING, 2012, 20 (03) : 35 - 40