RAILWAY PROJECT INTEGRATION ENGINEERING NEW METHODOLOGY

被引:0
|
作者
Donohue, Brian P. [1 ]
机构
[1] Parsons Brinckerhoff, Rail Vehicles, Denver, CO 80202 USA
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
In November, 2005 before an assembly of rail transit managers and engineers, keynote speaker Tom Prendergast then Vice President, Parsons Brinckerhoff T&RS - declared that the next frontier of railway engineering would be not in the "Big Four" engineering disciplines of Civil, Mechanical, Electrical or even Computer Engineering, but in "Integration Engineering." Years have passed and while Tom's words have not yet been fully realized by the transit industry, change is happening. Today, railway construction projects that have had major construction issues include the now beleaguered Edinburgh, Scotland "Edinburgh Tram" and the recently opened Hampton Roads Transit "Tide" Light Rail. Both projects have suffered from major cost overruns, work stoppages and legal entanglements, much of which can be attributed to a lack of scope clarity, especially utility identification & interfaces, and utility relocations. The lack of coordination for both projects can be traced back to the preliminary engineering level and continued, unchecked through final design and into construction where the lack of coordination and planning was realized too late. [1,2] Given the complexities of modem railway systems and the well-developed urban and suburban infrastructure where they are typically built, proper integration engineering is essential from the earliest phases of a project and should be carried through to the start of revenue operations and maintenance. There are however, examples of recently completed railway projects that have addressed project integration engineering successfully, finishing ahead of schedule, ahead of budget, or both. This paper is a continuation in a short series of presentations and papers that will address Railway Project Integration Engineering as a topic and recommend the integration tasks deemed critical to a successful project. The primary subject matter will be the Denver Eagle P3 - the first rail transit Public Private Partnership (P3) in the United States that has recently completed final design and is currently under construction. The materials and techniques to be presented are relatively new, and have already been used successfully in Europe. Should they prove successful with the Eagle P3, this could lower both cost and risk for future North American rail projects. This first paper will discuss the topic, review modeling techniques that were used to define the project integration process, and will capture the results of final design integration with both successes and difficulties. This paper will also cover the early stages of the Eagle P3 project construction, tie into the model, and attempt to project likely results when construction concludes and testing begins with the ultimate goal of meeting an ambitious schedule and budget when operations commence in January, 2016.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] Research on the Risk Assessment of Railway Engineering Project Based on FAHP Model
    Li, Suying
    Tian, Ya
    Wu, Yongli
    [J]. Journal of Railway Engineering Society, 2019, 36 (07) : 92 - 99
  • [22] Research on the Application of Railway Engineering Project Management System Based on BIM
    Zhang, Yi
    Huang, Congzhi
    Zhu, Cong
    [J]. Journal of Railway Engineering Society, 2019, 36 (09) : 98 - 103
  • [23] In situ stress state in engineering area of Dali-Lijiang railway and its impact on the railway project
    Ma, X. M.
    Peng, H.
    Li, J. S.
    [J]. BOUNDARIES OF ROCK MECHANICS: RECENT ADVANCES AND CHALLENGES FOR THE 21ST CENTURY, 2008, : 19 - 22
  • [24] Efficient data integration in the railway domain through an ontology-based methodology
    Verstichel, Stijn
    Ongenae, Femke
    Loeve, Leanneke
    Vermeulen, Frederik
    Dings, Pieter
    Dhoedt, Bart
    Dhaene, Tom
    De Turck, Filip
    [J]. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2011, 19 (04) : 617 - 643
  • [25] Chemical Engineering project design methodology based on Cooperative Learning
    Estay Niculcara, Christian
    Fernandez, Javier
    Gracia Villard, Santos
    Garcia-Carrillo, Agueda
    Cremades Oliver, Lazaro V.
    Dzul Lopez, Luis
    Gonzalez Benitez, Margarita
    [J]. AFINIDAD, 2009, 66 (539) : 7 - 14
  • [26] Methodology for integrating Concurrent Engineering concepts in a steelwork construction project
    Anumba, CJ
    Baldwin, AN
    Bouchlaghem, D
    Prasad, B
    Cutting-Decelle, AF
    Dufau, J
    Mommessin, M
    [J]. ADVANCES IN CONCURRENT ENGINEERING: CE99, 1999, 99 : 479 - 488
  • [27] Toward a model integration methodology for advanced applications in power engineering
    McArthur, SDJ
    Davidson, EM
    Dudgeon, GJW
    McDonald, JR
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (03) : 1205 - 1206
  • [28] Agile Software Engineering Methodology for Information Systems' Integration Projects
    Taveter, Kuldar
    Norta, Alex
    [J]. FUTURE DATA AND SECURITY ENGINEERING, 2017, 10646 : 215 - 230
  • [29] A system modelling methodology for materials and engineering systems design integration
    Lu, WF
    Deng, YM
    [J]. MATERIALS & DESIGN, 2004, 25 (06) : 459 - 469
  • [30] Integration of an Assessment Methodology for the Selection of Joining Technologies in Lightweight Engineering
    Choudry, Saphir A.
    Kaspar, Jerome
    Alber, Uwe
    Landgrebe, Dirk
    [J]. 28TH CIRP DESIGN CONFERENCE 2018, 2018, 70 : 217 - 222