Long-Term Scheduling of Large-Scale Hydropower Systems for Energy Maximization

被引:0
|
作者
Zhang Ming [1 ]
Fan Ziwu [1 ]
Guo Yongbin [1 ]
机构
[1] Nanjing Hydraul Res Inst, State Key Lab Hydrol Water Resources & Hydraul En, Nanjing 210029, Jiangsu, Peoples R China
关键词
large-scale mixed hydropower system; k-criterion method; operation chart; coordinates rotation method; hydropower scheduling problem;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A procedure called k-criterion method is introduced to solve the large-scale hydropower scheduling problem. It can reflect the internal operating principle of the hydropower system directly. In order to avoid the difficulties arising from calculating the equations in the process, the coordinates rotation method is adopted to transfer the decision-making process for multi-reservoirs simultaneously to single reservoir gradually. Utilizing the routine operation chart of hydro plant, the k-criterion method is improved and the result derived from it is more reasonable. Taking for an example of the large-scale hydropower system which consists of eleven hydro plants in the middle-upper Yangtze River basin, the model of maximizing the energy with fixed firm power is tested in the paper.
引用
收藏
页码:133 / 138
页数:6
相关论文
共 50 条
  • [1] Short-term scheduling of large-scale hydropower systems for energy maximization
    Wang, JW
    Yuan, XH
    Zhang, YC
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2004, 130 (03) : 198 - 205
  • [2] Long-Term Scheduling of Large-Scale Cascade Hydropower Stations Using Improved Differential Evolution Algorithm
    Wen, Xiaohao
    Zhou, Jianzhong
    He, Zhongzheng
    Wang, Chao
    WATER, 2018, 10 (04)
  • [3] Interior point method for long-term generation scheduling of large-scale hydrothermal systems
    Anibal Tavares Azevedo
    Aurelio Ribeiro Leite Oliveira
    Secundino Soares
    Annals of Operations Research, 2009, 169 : 55 - 80
  • [4] Advantages of Deterministic Optimization in Long-Term Hydrothermal Scheduling of Large-Scale Power Systems
    Zambelli, Monica De Souza
    Martins, Leonardo S. A.
    Soares Filho, Secundino
    2013 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PES), 2013,
  • [5] Interior point method for long-term generation scheduling of large-scale hydrothermal systems
    Azevedo, Anibal Tavares
    Leite Oliveira, Aurelio Ribeiro
    Soares, Secundino
    ANNALS OF OPERATIONS RESEARCH, 2009, 169 (01) : 55 - 80
  • [6] Numerical analysis of the long-term stability of large-scale underground cavern of hydropower station
    Jiang Yu-zhou
    Xu Wei-ya
    Wang Rui-hong
    Wang Wei
    ROCK AND SOIL MECHANICS, 2008, 29 : 52 - 58
  • [7] A Multi-Core Parallel Genetic Algorithm for the Long-Term Optimal Operation of Large-Scale Hydropower Systems
    Liu, Benxi
    Liao, Shengli
    Cheng, Chuntian
    Wu, Xinyu
    WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2016: WATERSHED MANAGEMENT, IRRIGATION AND DRAINAGE, AND WATER RESOURCES PLANNING AND MANAGEMENT, 2016, : 220 - 230
  • [8] Scalable Long-Term Safety Certificate for Large-Scale Systems
    Hoshino, Kenta
    Wang, Zhuoyuan
    Nakahira, Yorie
    IEEE CONTROL SYSTEMS LETTERS, 2023, 7 : 1285 - 1290
  • [9] Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head
    Cheng, Chuntian
    Shen, Jianjian
    Wu, Xinyu
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2012, 138 (03) : 257 - 267
  • [10] Large-Scale Long-term Generation Scheduling With Fuel Limits and Emission Limits
    Yan, Yong
    Wen, Fushuan
    Wang, Jian
    2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 4559 - 4563