Interior point method for long-term generation scheduling of large-scale hydrothermal systems

被引:0
|
作者
Anibal Tavares Azevedo
Aurelio Ribeiro Leite Oliveira
Secundino Soares
机构
[1] Paulista State University,Mathematic Department
[2] State University of Campinas,Applied Mathematic Department
[3] State University of Campinas,School of Electrical and Computer Engineering
来源
关键词
Hydrothermal generation scheduling; Long-term operational planning; Nonlinear optimization; Interior point method;
D O I
暂无
中图分类号
学科分类号
摘要
This paper presents an interior point method for the long-term generation scheduling of large-scale hydrothermal systems. The problem is formulated as a nonlinear programming one due to the nonlinear representation of hydropower production and thermal fuel cost functions. Sparsity exploitation techniques and an heuristic procedure for computing the interior point method search directions have been developed. Numerical tests in case studies with systems of different dimensions and inflow scenarios have been carried out in order to evaluate the proposed method. Three systems were tested, with the largest being the Brazilian hydropower system with 74 hydro plants distributed in several cascades. Results show that the proposed method is an efficient and robust tool for solving the long-term generation scheduling problem.
引用
收藏
页码:55 / 80
页数:25
相关论文
共 50 条
  • [1] Interior point method for long-term generation scheduling of large-scale hydrothermal systems
    Azevedo, Anibal Tavares
    Leite Oliveira, Aurelio Ribeiro
    Soares, Secundino
    [J]. ANNALS OF OPERATIONS RESEARCH, 2009, 169 (01) : 55 - 80
  • [2] Advantages of Deterministic Optimization in Long-Term Hydrothermal Scheduling of Large-Scale Power Systems
    Zambelli, Monica De Souza
    Martins, Leonardo S. A.
    Soares Filho, Secundino
    [J]. 2013 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PES), 2013,
  • [3] Long-Term Scheduling of Large-Scale Hydropower Systems for Energy Maximization
    Zhang Ming
    Fan Ziwu
    Guo Yongbin
    [J]. ADVANCES IN HYDRAULIC PHYSICAL MODELING AND FIELD INVESTMENT AND INVESTIGATION, 2010, : 133 - 138
  • [4] Large-Scale Long-term Generation Scheduling With Fuel Limits and Emission Limits
    Yan, Yong
    Wen, Fushuan
    Wang, Jian
    [J]. 2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 4559 - 4563
  • [5] Long term hydrothermal scheduling linear programming model for large scale power systems
    Jimenez, Romel W.
    Paucar, V. L.
    [J]. 2007 LARGE ENGINEERING SYSTEMS CONFERENCE ON POWER ENGINEERING, 2007, : 95 - 99
  • [6] Scalable Long-Term Safety Certificate for Large-Scale Systems
    Hoshino, Kenta
    Wang, Zhuoyuan
    Nakahira, Yorie
    [J]. IEEE CONTROL SYSTEMS LETTERS, 2023, 7 : 1285 - 1290
  • [7] PointOdyssey: A Large-Scale Synthetic Dataset for Long-Term Point Tracking
    Zheng, Yang
    Harley, Adam W.
    Shen, Bokui
    Wetzstein, Gordon
    Guibas, Leonidas J.
    [J]. 2023 IEEE/CVF INTERNATIONAL CONFERENCE ON COMPUTER VISION (ICCV 2023), 2023, : 19798 - 19808
  • [8] A long-term unit commitment problem with hydrothermal coordination for economic and emission control in large-scale electricity systems
    Franz, Alexander
    Rieck, Julia
    Zimmermann, Juergen
    [J]. OR SPECTRUM, 2020, 42 (01) : 235 - 259
  • [9] A long-term unit commitment problem with hydrothermal coordination for economic and emission control in large-scale electricity systems
    Alexander Franz
    Julia Rieck
    Jürgen Zimmermann
    [J]. OR Spectrum, 2020, 42 : 235 - 259
  • [10] Long-term operation experiences with large-scale solar systems in Slovenia
    Arkar, C
    Medved, S
    Novak, P
    [J]. RENEWABLE ENERGY, 1999, 16 (1-4) : 669 - 672