Short-term scheduling of large-scale hydropower systems for energy maximization

被引:31
|
作者
Wang, JW [1 ]
Yuan, XH [1 ]
Zhang, YC [1 ]
机构
[1] Huazhong Univ Sci & Technol, Coll Hydropower & Informat Engn, Wuhan 430074, Peoples R China
关键词
research; scheduling; hydroelectric power generation; optimization;
D O I
10.1061/(ASCE)0733-9496(2004)130:3(198)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper describes a short-term hydro generation optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to maximize hydropower production, given the beginning-of-study content of each reservoir and the end-of-study contents of the reservoirs with long-term storage. The optimal hydro scheduling problem is formulated as nonlinear programming with linear constraints and is solved by a direct search procedure. A cycling module is used to estimate the end-of-study contents of the reservoirs with short-term storage and the discharge delay releases from upper reservoirs, and then a transition module is solved to obtain the optimal generation scheduling. The system model is already operational for large-scale hydro systems, and currently is being used by FEPCL's operation engineers to determine hourly or half-hourly generation schedules over a period of up to three days.
引用
收藏
页码:198 / 205
页数:8
相关论文
共 50 条
  • [1] Long-Term Scheduling of Large-Scale Hydropower Systems for Energy Maximization
    Zhang Ming
    Fan Ziwu
    Guo Yongbin
    [J]. ADVANCES IN HYDRAULIC PHYSICAL MODELING AND FIELD INVESTMENT AND INVESTIGATION, 2010, : 133 - 138
  • [2] Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head
    Cheng, Chuntian
    Shen, Jianjian
    Wu, Xinyu
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2012, 138 (03) : 257 - 267
  • [3] OPTIMAL SHORT-TERM SCHEDULING OF LARGE-SCALE POWER-SYSTEMS
    BERTSEKAS, DP
    LAUER, GS
    SANDELL, NR
    POSBERGH, TA
    [J]. IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1983, 28 (01) : 1 - 11
  • [4] Efficient Tabu Search Procedure for Short-Term Planning of Large-Scale Hydropower Systems
    Marchand, Alexia
    Gendreau, Michel
    Blais, Marko
    Emiel, Gregory
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2019, 145 (07)
  • [5] Optimization of short-term scheduling of power plant units in large-scale cogeneration systems
    Hönig, P
    Welfonder, E
    [J]. POWER PLANTS AND POWER SYSTEMS CONTROL 2000, 2000, : 287 - 295
  • [6] Hybrid Model for Short-Term Scheduling of Hydropower Systems
    Hidalgo, Ieda G.
    Correia, Paulo B.
    Arnold, Francisco J.
    Estrocio, Joao Paulo F.
    de Barros, Regiane S.
    Fernandes, Jessica P. T.
    Yeh, William W. -G.
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2015, 141 (03)
  • [7] Parallelly solving short-term optimal operation for large-scale hydropower plants
    [J]. Mei, Y. (ydmei@whu.edu.cn), 1600, Huazhong University of Science and Technology (41):
  • [8] Optimal Short-Term Scheduling of Large-Scale Multistage Batch Plants
    Castro, Pedro M.
    Hariunkoski, Iiro
    Grossmann, Ignacio E.
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2009, 48 (24) : 11002 - 11016
  • [9] OPTIMAL SHORT-TERM SCHEDULING FOR A LARGE-SCALE CASCADED HYDRO SYSTEM
    PIEKUTOWSKI, MR
    LITWINOWICZ, T
    FROWD, RJ
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (02) : 805 - 811
  • [10] Practical Method for Short-term Operations of Large-scale Hydropower Plants in Power Grids With Rich Hydropower
    Shen, Jianjian
    Zhang, Xiufei
    Cao, Rui
    Cheng, Chuntian
    Li, Xiufeng
    Wu, Yang
    Zhou, Binbin
    [J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2019, 39 (10): : 2816 - 2827