PROJECT SCHEDULING WITH FEEDING PRECEDENCE RELATIONS: AN APPLICATION TO PRODUCTION PLANNING

被引:0
|
作者
Tolio, Tullio [1 ]
Urgo, Marcello [1 ]
Alfieri, Arianna
机构
[1] Politecn Milan, Dept Mech Engn, Mfg & Prod Syst Div, I-20133 Milan, Italy
关键词
D O I
暂无
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
Production planning in Manufacturing-to-Order environments producing complex items must manage the execution of fabrication and/or assembling activities. In case of activities executed by workers, the committed effort can vary over time. To model this behavior, the Variable Intensity formulation has been proposed in the literature. In addition, the activities to be scheduled often represent whole production phases made of distinct production operations. Hence, the utilization of simple finish-to-start precedence relations does not correctly represent the real production process. In such cases Generalized Precedence Relations are used to allow overlapping among activities. However, since in Variable Intensity formulations the percentage execution of the activities is no more univocally related to their time execution, Generalized Precedence Relations cannot completely describe the constraints among activities. In this paper two mathematical formulations of precedence relations based on processing execution are presented to model overlapping between activities. The formulations are applied to an industrial case of production of machining centers and compared in terms of computational efficiency.
引用
收藏
页码:419 / 426
页数:8
相关论文
共 50 条
  • [1] A project scheduling approach to production planning with feeding precedence relations
    Alfieri, Arianna
    Tolio, Tullio
    Urgo, Marcello
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (04) : 995 - 1020
  • [2] Scheduling activities in project network with feeding precedence relations: an earliest start forward recursion algorithm
    Bianco, Lucio
    Caramia, Massimiliano
    Giordani, Stefano
    Salvatore, Alessio
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 193 - 224
  • [3] The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations
    Luis Ponz-Tienda, Jose
    Pellicer, Eugenio
    Benlloch-Marco, Javier
    Andres-Romano, Carlos
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2015, 30 (11) : 872 - 891
  • [4] Resource Constrained Project Scheduling with General Precedence Relations Optimized with SAT
    Alves, Rui
    Alvelos, Filipe
    Sousa, Sergio Dinis
    PROGRESS IN ARTIFICIAL INTELLIGENCE, EPIA 2013, 2013, 8154 : 199 - 210
  • [5] Project scheduling approach to production planning
    Márkus, A
    Váncza, J
    Kis, T
    Kovács, A
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2003, 52 (01) : 359 - 362
  • [6] Project scheduling with generalized precedence relations: A new method to analyze criticalities and flexibilities
    Bianco, Lucio
    Caramia, Massimiliano
    Giordani, Stefano
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 298 (02) : 451 - 462
  • [7] Planning and re-planning in project and production scheduling
    Calhoun, KM
    Deckro, RF
    Moore, JT
    Chrissis, JW
    Van Hove, JC
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2002, 30 (03): : 155 - 170
  • [8] REDUCING RENEWABLE RESOURCE DEMAND FLUCTUATION USING SOFT PRECEDENCE RELATIONS IN PROJECT SCHEDULING
    Jaskowski, Piotr
    Biruk, Slawomir
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2018, 24 (04) : 355 - 363
  • [9] Ant colony optimization for resource-constrained project scheduling with generalized precedence relations
    Luo, SP
    Wang, C
    Wang, JW
    15TH IEEE INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2003, : 284 - 289
  • [10] An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations
    Bianco, Lucio
    Caramia, Massimiliano
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 219 (01) : 73 - 85