PROJECT SCHEDULING WITH FEEDING PRECEDENCE RELATIONS: AN APPLICATION TO PRODUCTION PLANNING

被引:0
|
作者
Tolio, Tullio [1 ]
Urgo, Marcello [1 ]
Alfieri, Arianna
机构
[1] Politecn Milan, Dept Mech Engn, Mfg & Prod Syst Div, I-20133 Milan, Italy
关键词
D O I
暂无
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
Production planning in Manufacturing-to-Order environments producing complex items must manage the execution of fabrication and/or assembling activities. In case of activities executed by workers, the committed effort can vary over time. To model this behavior, the Variable Intensity formulation has been proposed in the literature. In addition, the activities to be scheduled often represent whole production phases made of distinct production operations. Hence, the utilization of simple finish-to-start precedence relations does not correctly represent the real production process. In such cases Generalized Precedence Relations are used to allow overlapping among activities. However, since in Variable Intensity formulations the percentage execution of the activities is no more univocally related to their time execution, Generalized Precedence Relations cannot completely describe the constraints among activities. In this paper two mathematical formulations of precedence relations based on processing execution are presented to model overlapping between activities. The formulations are applied to an industrial case of production of machining centers and compared in terms of computational efficiency.
引用
收藏
页码:419 / 426
页数:8
相关论文
共 50 条
  • [21] A Branch and Bound algorithm for the Weighted Earliness-Tardiness Project Scheduling Problem with Generalized Precedence Relations
    Afshar Nadjafi, B.
    Shadrokh, S.
    Scientia Iranica, 2009, 16 (1 E) : 55 - 64
  • [22] A simulation application framework for production planning and scheduling
    Veeke, HPM
    Lodewijks, G
    ISC'2005: 3rd Industrial Simulation Conference 2005, 2005, : 187 - 192
  • [23] Multi-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relations
    Gomes, Helton Cristiano
    das Neves, Francisco de Assis
    Freitas Souza, Marcone Jamilson
    COMPUTERS & OPERATIONS RESEARCH, 2014, 44 : 92 - 104
  • [24] PARAMETRIC PRECEDENCE RELATIONS IN SINGLE-MACHINE SCHEDULING
    SZWARC, W
    OPERATIONS RESEARCH LETTERS, 1990, 9 (02) : 133 - 140
  • [25] INTEGRATED APPROACH TO GENERATION OF PRECEDENCE RELATIONS AND PRECEDENCE GRAPHS FOR ASSEMBLY SEQUENCE PLANNING
    Niu Xinwen Ding Han Xiong YoulunSchool of Mechanical Science and Engineering
    Chinese Journal of Mechanical Engineering, 2002, (03) : 193 - 198
  • [26] Integrated approach to generation of precedence relations and precedence graphs for assembly sequence planning
    Niu, Xinwen
    Ding, Han
    Xiong, Youlun
    Chinese Journal of Mechanical Engineering (English Edition), 2002, 15 (03): : 193 - 198
  • [27] Application of project management tool in construction for Planning, Scheduling and Optimization
    Shah P.
    Chandragade A.A.
    Materials Today: Proceedings, 2023, 77 : 773 - 779
  • [28] Zero-One Formulation for a Partial Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations
    Su, Zhi-Xiong
    Wei, Han-Ying
    Zou, Xin
    Qi, Jian-Xun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (03)
  • [29] Disassembly Planning Based on Precedence Relations among Assemblies
    F. Torres
    S.T. Puente
    R. Aracil
    The International Journal of Advanced Manufacturing Technology, 2003, 21 : 317 - 327
  • [30] Disassembly planning based on precedence relations among assemblies
    Torres, F.
    Puente, S.T.
    Aracil, R.
    International Journal of Advanced Manufacturing Technology, 2003, 21 (05): : 317 - 327