CRITICALITY MEASURES FOR TIME CONSTRAINT TUNNELS IN SEMICONDUCTOR MANUFACTURING

被引:0
|
作者
Anthouard, Benjamin [1 ]
Borodin, Valeria [1 ]
Dauzere-Peres, Stephane [1 ]
Christ, Quentin [2 ]
Roussel, Renaud [2 ]
机构
[1] Univ Clermont Auvergne, Mines St Etienne, UMR 6158 LIMOS, CNRS, 880 Ave Mimet, F-13129 Gardanne, France
[2] STMicroelectronics, 850 Rue Jean Monnet, F-38920 Crolles, France
关键词
SHIFTING BOTTLENECK PROCEDURE;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Semiconductor manufacturing processes include more and more (queue) time constraints often spanning multiple operations, which impact both production efficiency and quality. After recalling the problem of time constraint management, this paper focuses on the notion of criticality defined in terms of time constraints at an operational decision level. Various criticality measures are presented. A discrete-event simulation-based approach is used to evaluate the criticality of machines for time constraints. Computational experiments conducted on industrial instances are discussed. The paper ends with some conclusions and perspectives.
引用
收藏
页码:3326 / 3337
页数:12
相关论文
共 50 条
  • [1] ANALYZING DIFFERENT DISPATCHING POLICIES FOR PROBABILITY ESTIMATION IN TIME CONSTRAINT TUNNELS IN SEMICONDUCTOR MANUFACTURING
    Lima, Alexandre
    2017 WINTER SIMULATION CONFERENCE (WSC), 2017, : 4606 - 4607
  • [2] A Simulation-Based Approach for Operational Management of Time Constraint Tunnels in Semiconductor Manufacturing
    Anthouard, Benjamin
    Borodin, Valeria
    Christ, Quentin
    Dauzere-Peres, Stephane
    Roussel, Renaud
    2022 33RD ANNUAL SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE (ASMC), 2022,
  • [3] ANALYZING DIFFERENT DISPATCHING POLICIES FOR PROBABILITY ESTIMATION IN TIME CONSTRAINT TUNNELS IN SEMICONDUCTOR MANUFACTURING
    Lima, Alexandre
    Borodin, Valeria
    Dauzere-Peres, Stephane
    Vialletelle, Philippe
    2017 WINTER SIMULATION CONFERENCE (WSC), 2017, : 3543 - 3554
  • [4] A sampling-based approach for managing lot release in time constraint tunnels in semiconductor manufacturing
    Lima, Alexandre
    Borodin, Valeria
    Dauzere-Peres, Stephane
    Vialletelle, Philippe
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (03) : 860 - 884
  • [5] A solution for dedicated machine constraint in semiconductor manufacturing
    Shr, Arthur M. D.
    Liu, Alan
    Chen, Peter P.
    2006 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-6, PROCEEDINGS, 2006, : 4747 - +
  • [6] Measures and trends in energy use of semiconductor manufacturing
    Deng, Liqiu
    Williams, Eric
    2008 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS AND THE ENVIRONMENT, 2008, : 155 - +
  • [7] Precise time synchronization in semiconductor manufacturing
    Anandarajah, Vinod
    Kalappa, Naveen
    Sangole, Rahul
    Hussaini, Sulaiman
    Li, Ya-Shian
    Baboud, Julien
    Moyne, James
    2007 IEEE INTERNATIONAL SYMPOSIUM ON PRECISION CLOCK SYNCHRONIZATION FOR MEASUREMENT CONTROL AND COMMUNICATION, 2007, : 78 - +
  • [8] Application of a constraint based production line management system for semiconductor manufacturing
    Babikian, R
    Sanders, M
    1997 IEEE INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING CONFERENCE PROCEEDINGS, 1997, : A41 - A44
  • [9] Using a Multiagent Scheduling system for dedicated machine constraint in semiconductor manufacturing
    Liu, Alan
    Chen, Peter P.
    Shr, Arthur M. D.
    Yen-Ru Cheng
    2006 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-6, PROCEEDINGS, 2006, : 3262 - +
  • [10] IDEAL AND POTENTIAL FLEXIBILITY MEASURES FOR QUALIFICATION MANAGEMENT IN SEMICONDUCTOR MANUFACTURING
    Pianne, Amelie
    Rivero, Luis
    Dauzere-Peres, Stephane
    Vialletelle, Philippe
    2016 WINTER SIMULATION CONFERENCE (WSC), 2016, : 2621 - 2632