Single machine scheduling problem with stochastic sequence-dependent setup times

被引:20
|
作者
Ertem, Mehmet [1 ]
Ozcelik, Feristah [1 ]
Sarac, Tugba [1 ]
机构
[1] Eskisehir Osmangazi Univ, Dept Ind Engn, Eskisehir, Turkey
关键词
single machine scheduling problem; stochastic sequence-dependent setup times; Genetic Algorithm; stochastic programming; value of the stochastic solution; TARDY JOBS; GENETIC ALGORITHM; PROCESSING TIMES; TOTAL TARDINESS; EXPECTED NUMBER; BOUNDED SETUP; SUPPLY CHAIN; FLOWSHOP; MINIMIZE; OPTIMIZATION;
D O I
10.1080/00207543.2019.1581383
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, we consider stochastic single machine scheduling problem. We assume that setup times are both sequence dependent and uncertain while processing times and due dates are deterministic. In the literature, most of the studies consider the uncertainty on processing times or due dates. However, in the real-world applications (i.e. plastic moulding industry, appliance assembly, etc.), it is common to see varying setup times due to labour or setup tools availability. In order to cover this fact in machine scheduling, we set our objective as to minimise the total expected tardiness under uncertain sequence-dependent setup times. For the solution of this NP-hard problem, several heuristics and some dynamic programming algorithms have been developed. However, none of these approaches provide an exact solution for the problem. In this study, a two-stage stochastic-programming method is utilised for the optimal solution of the problem. In addition, a Genetic Algorithm approach is proposed to solve the large-size problems approximately. Finally, the results of the stochastic approach are compared with the deterministic one to demonstrate the value of the stochastic solution.
引用
收藏
页码:3273 / 3289
页数:17
相关论文
共 50 条
  • [31] Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times
    Chun-Lung Chen
    Chuen-Lung Chen
    The International Journal of Advanced Manufacturing Technology, 2009, 43 : 161 - 169
  • [32] A bicriteria m-machine flowshop scheduling with sequence-dependent setup times
    Eren, Tamer
    APPLIED MATHEMATICAL MODELLING, 2010, 34 (02) : 284 - 293
  • [33] Machine Scheduling with Sequence-dependent Setup Times using a Randomized Search Heuristic
    Montoya-Torres, Jairo R.
    Soto-Ferrari, Milton
    Gonzalez-Solano, Fernando
    Alfonso-Lizarazo, Edgar H.
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 28 - +
  • [34] Multi-agent based approach for single machine scheduling with sequence-dependent setup times and machine maintenance
    Kaplanoglu, Vahit
    APPLIED SOFT COMPUTING, 2014, 23 : 165 - 179
  • [35] Minimizing total tardiness on a single machine with sequence-dependent setup times
    Souissi, A
    Kacem, I
    Chu, C
    2004 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOLS 1-7, 2004, : 1481 - 1485
  • [36] Metaheuristic solutions to the "Job shop scheduling problem with sequence-dependent setup times"
    Gonzalez, Miguel A.
    AI COMMUNICATIONS, 2013, 26 (04) : 419 - 421
  • [37] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    Mathematical Problems in Engineering, 2022, 2022
  • [38] Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times
    Chen, Chun-Lung
    Chen, Chuen-Lung
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (1-2): : 161 - 169
  • [39] Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times
    S. Afshin Mansouri
    S. Hamed Hendizadeh
    Nasser Salmasi
    The International Journal of Advanced Manufacturing Technology, 2009, 40 : 1216 - 1226
  • [40] Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times
    Mansouri, S. Afshin
    Hendizadeh, S. Hamed
    Salmasi, Nasser
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (11-12): : 1216 - 1226