共 50 条
- [31] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 47 (5-8): : 773 - 781
- [32] A two-stage Ant Colony Optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times [J]. Journal of Intelligent Manufacturing, 2010, 21 : 693 - 701
- [34] A Clonal Selection Algorithm for Makespan Minimization on Unrelated Parallel Machines with Sequence Dependent Setup Times [J]. 2013 BRAZILIAN CONFERENCE ON INTELLIGENT SYSTEMS (BRACIS), 2013, : 57 - 63
- [37] A genetic algorithm for the batch scheduling with sequence-dependent setup times [J]. INTELLIGENT COMPUTING IN SIGNAL PROCESSING AND PATTERN RECOGNITION, 2006, 345 : 1137 - 1144
- [40] Scheduling unrelated parallel machines with a common server and sequence dependent setup times [J]. IFAC PAPERSONLINE, 2022, 55 (10): : 2179 - 2184