共 50 条
- [1] Makespan minimization for scheduling unrelated parallel machines with setup times [J]. Journal of Intelligent Manufacturing, 2012, 23 : 1795 - 1803
- [3] A worm optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times [J]. Annals of Operations Research, 2020, 285 : 273 - 293
- [7] A two-stage Ant Colony Optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times [J]. Journal of Intelligent Manufacturing, 2010, 21 : 693 - 701
- [8] Scheduling unrelated parallel machines with sequence-dependent setup times [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (9-12): : 1487 - 1496
- [10] Scheduling unrelated parallel machines with sequence-dependent setup times [J]. The International Journal of Advanced Manufacturing Technology, 2015, 81 : 1487 - 1496