A GENETIC ALGORITHM FOR PROJECT SCHEDULING IN ACTIVITY NETWORKS UNDER RESOURCE COMPLEMENTARITY

被引:0
|
作者
Silva, Helder [1 ]
Oliveira, Jose [2 ]
Tereso, Anabela [2 ]
机构
[1] Tecnol Amazonas, IFAM Inst Fed Educ, Manaus, Amazonas, Brazil
[2] Univ Minho, Dept Prod & Sistemas, P-4710057 Braga, Portugal
关键词
Project Management; Scheduling; Complementarity of resources;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
We address the issue of optimal resource allocation, and more specifically, the analysis of complementarity of resources (primary resource or P-resource and supportive resource or S-resource) to activities in a project. The concept of complementarity can be incorporated into the engineering domain as an enhancement of the efficacy of a "primary" resource (P-resource) by adding to it other "supportive" resources (S-resources). We developed a Genetic Algorithm capable of determining the ideal mixture of resources allocated to the activities of a project, such that the project is completed with minimal cost. This problem has a circularity issue that greatly increases its complexity. In this paper we present a constructive algorithm to build solutions from a chromosome that will be integrated in a Genetic Algorithm, which we illustrate by application to a small instance of the problem. The Genetic Algorithm is based on a random keys chromosome that is very easy to implement and allows using conventional genetic operators for combinatorial optimization problems. A project is formed by a set of activities. Each activity uses a specific set of resources, and it is also necessary to guarantee that there is no overlap in the time it takes to process activities in the same resource.
引用
收藏
页码:95 / 99
页数:5
相关论文
共 50 条
  • [1] A self-adapting genetic algorithm for project scheduling under resource constraints
    Hartmann, S
    NAVAL RESEARCH LOGISTICS, 2002, 49 (05) : 433 - 448
  • [2] A robust genetic algorithm for resource allocation in project scheduling
    Alcaraz, J
    Maroto, C
    ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 83 - 109
  • [3] Genetic algorithm for resource leveling problem in project scheduling
    Liu, S.X.
    Wang, M.G.
    2001, Systems Engineering Society of China (21):
  • [4] A Robust Genetic Algorithm for Resource Allocation in Project Scheduling
    J. Alcaraz
    C. Maroto
    Annals of Operations Research, 2001, 102 : 83 - 109
  • [5] A Genetic Algorithm for the Proactive Resource-Constrained Project Scheduling Problem With Activity Splitting
    Ma, Zhiqiang
    He, Zhengwen
    Wang, Nengmin
    Yang, Zhen
    Demeulemeester, Erik
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2019, 66 (03) : 459 - 474
  • [6] A Genetic Hyperheuristic Algorithm for the Resource Constrained Project Scheduling Problem
    Anagnostopoulos, Konstantinos P.
    Koulinas, Georgios K.
    2010 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2010,
  • [7] A genetic algorithm for proactive project scheduling with resource transfer times
    Ma, Zhiqiang
    Zheng, Weibo
    He, Zhengwen
    Wang, Nengmin
    Hu, Xuejun
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 174
  • [8] A genetic algorithm for optimal resource-driven project scheduling
    Kaiafa, Sofia
    Chassiakos, Athanasios P.
    CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 : 260 - 267
  • [9] A competitive genetic algorithm for resource-constrained project scheduling
    Hartmann, S
    NAVAL RESEARCH LOGISTICS, 1998, 45 (07) : 733 - 750
  • [10] Genetic Algorithm for Solving the Resource Constrained Project Scheduling Problem
    Alaa, Touihri
    Saoussen, Krichen
    Adel, Guitouni
    INTERNATIONAL JOURNAL OF APPLIED METAHEURISTIC COMPUTING, 2015, 6 (02) : 45 - 60