Stress relaxation testing of pre-compression ring mock-up for the ITER magnet system

被引:7
|
作者
Rossi, R. [1 ]
Annino, C. [1 ]
Baker, W. [3 ]
Bettinali, L. [1 ]
Knaster, J. [4 ]
Lo Bue, A. [1 ]
Mazzone, G. [4 ]
Nardi, C. [1 ]
Pizzuto, A. [1 ]
Semeraro, L. [2 ]
机构
[1] EURATOM, ENEA Fus, CR Frascati, I-00044 Frascati, Italy
[2] Fus Energy, Barcelona 08019, Spain
[3] EFDA CSU, D-85748 Garching, Germany
[4] ITER Cadarache, F-13108 St Paul Les Durance, France
关键词
Composite; Epoxy; Fibreglass; ITER; Pre-compression rings;
D O I
10.1016/j.fusengdes.2008.12.024
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The ITER pre-compression ring system is based on two sets of 3 rings made in fibreglass-epoxy composite and is located on top and bottom of the inner straight leg region. These rings will provide a radial force of about 70 MN/coil (35 MN at the top and 35 MN at the bottom) under cryogenic conditions, pulling the TF coils into contact, reducing the gap between the poloidal shear keys and their keyways during operation and also reducing the toroidal tension in the four Outer intercoil structures bands. The paper describes the stress relaxation test performed in ENEA Frascati laboratories on a reduced scale glass fibre-epoxy composite ring. The ring was manufactured with a diameter of 1 m (1/5 of the real scale one) by winding S2 glass fibres then impregnated with epoxy. The volumetric glass content was of 69% and no significant presence of defects was verified by an X-ray survey. The test has been carried out following as close as possible the ASTM standard E 328-86. The ring has been inserted into a dedicated hydraulic testing machine consisting of 18 radial pulling actuators and then loaded up to a ring membrane hoop stress of 800 MPa. The deformation has been maintained constant during the test by inserting a solid steel disk in the machine centre restraining the machine radial motion. Average hoop stress has been daily monitored measuring the force required to lift the ring just free of the constraints during the test period. The ring performed 125 testing days showing no significant stress relaxation and a small reduction of the ring stiffness that appeared mainly in the first days of the test. (C) 2009 Published by Elsevier B.V.
引用
收藏
页码:1649 / 1652
页数:4
相关论文
共 40 条
  • [1] Ultimate tensile strength testing campaign on ITER pre-compression ring mock-ups
    Rossi, Paolo
    Capobianchi, Mario
    Crescenzi, Fabio
    Massimi, Alberto
    Mugnaini, Giampiero
    Nardi, Claudio
    Pizzuto, Aldo
    Bettinali, Livio
    Knaster, Juan
    Rajainmaki, Hannu
    Evans, David
    FUSION ENGINEERING AND DESIGN, 2011, 86 (6-8) : 1519 - 1522
  • [2] Acceptance Test of Pre-Compression Rings for ITER Magnet System
    Ilyin, Yuri
    Mitchell, Neil
    Sanchez, Angela Hernandez
    Boter, Eva
    Semeraro, Luigi
    Bonito-Oliva, Alessandro
    Besson, Remi
    Torres, Luc
    Balut, Nicolas
    Herve, Catherine
    Baikalov, Andrei
    Lim, Byung Su
    Boyer, Christelle
    Liao, Min
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2024, 34 (05) : 1 - 5
  • [3] ITER Pre-Compression Ring Tightening Analysis
    Reccia, L.
    Portone, A.
    Sawa, N.
    Mitchell, N.
    Koczorowski, S.
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2024, 34 (05) : 1 - 5
  • [4] The pre-compression system of the toroidal field coils in ITER
    Knaster, J.
    Feffari, M.
    Jong, C.
    Vollmann, T.
    FUSION ENGINEERING AND DESIGN, 2007, 82 (5-14) : 1413 - 1422
  • [5] Mock-up testing facilities and qualification strategy for EU ITER TBMs
    Aiello, A.
    Buehler, L.
    Ciampichetti, A.
    Demange, D.
    Doerr, L.
    Freibergs, J. F.
    Ghidersa, B.
    Ilic, M.
    Laffont, G.
    Messemer, G.
    Platnieks, I.
    Rampal, G.
    FUSION ENGINEERING AND DESIGN, 2010, 85 (10-12) : 2012 - 2021
  • [6] Mock-up testing of the monorail crane system for remote maintenance of the ITER neutral beam cell
    Damiani, Carlo
    Smith, Kevin
    Gutierrez, Mikel Bilbao
    Balague, Susagna
    Van Uffelen, Marco
    Fichot, Denis
    Pelletier, Pierre-Robert
    Calloud, Vincent
    Fuzier, Frederic
    Montgomerie, Jon
    Choi, Chang-Hwan
    FUSION ENGINEERING AND DESIGN, 2023, 187
  • [7] Mechanical Tests on Reduced Scale Mock-Ups of ITER Pre-compression Rings
    Rossi, Paolo
    Ilyin, Yuri
    Mitchell, Neil
    Boter, Eva
    Hernandez, Angela
    Bonito-Oliva, Alessandro
    Mugnaini, Giampiero
    Saidoun, Abdelkrim
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2024, 34 (05) : 1 - 4
  • [8] Neutron and photon flux spectra in a mock-up of the ITER shielding system
    Freiesleben, H
    Hansen, W
    Richter, D
    Seidel, K
    Unholzer, S
    Fischer, U
    Wu, Y
    Angelone, M
    Batistoni, P
    Pillon, M
    FUSION ENGINEERING AND DESIGN, 1998, 42 : 247 - 253
  • [9] Tests on a mock-up of the feedback controlled matching options of the ITER ICRH system
    Grine, D.
    Vervier, M.
    Messiaen, A.
    Dumortier, R.
    RADIO FREQUENCY POWER IN PLASMAS, 2009, 1187 : 285 - 288
  • [10] Mock-up test on key components of ITER blanket remote handling system
    Takeda, Nobukazu
    Kakudate, Satoshi
    Nakahira, Masataka
    Matsumoto, Yasuhiro
    Taguchi, Koh
    Kozaka, Hiroshi
    Shibanuma, Kiyoshi
    Tesini, Alessandro
    FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) : 1813 - 1817