Stress relaxation testing of pre-compression ring mock-up for the ITER magnet system

被引:7
|
作者
Rossi, R. [1 ]
Annino, C. [1 ]
Baker, W. [3 ]
Bettinali, L. [1 ]
Knaster, J. [4 ]
Lo Bue, A. [1 ]
Mazzone, G. [4 ]
Nardi, C. [1 ]
Pizzuto, A. [1 ]
Semeraro, L. [2 ]
机构
[1] EURATOM, ENEA Fus, CR Frascati, I-00044 Frascati, Italy
[2] Fus Energy, Barcelona 08019, Spain
[3] EFDA CSU, D-85748 Garching, Germany
[4] ITER Cadarache, F-13108 St Paul Les Durance, France
关键词
Composite; Epoxy; Fibreglass; ITER; Pre-compression rings;
D O I
10.1016/j.fusengdes.2008.12.024
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The ITER pre-compression ring system is based on two sets of 3 rings made in fibreglass-epoxy composite and is located on top and bottom of the inner straight leg region. These rings will provide a radial force of about 70 MN/coil (35 MN at the top and 35 MN at the bottom) under cryogenic conditions, pulling the TF coils into contact, reducing the gap between the poloidal shear keys and their keyways during operation and also reducing the toroidal tension in the four Outer intercoil structures bands. The paper describes the stress relaxation test performed in ENEA Frascati laboratories on a reduced scale glass fibre-epoxy composite ring. The ring was manufactured with a diameter of 1 m (1/5 of the real scale one) by winding S2 glass fibres then impregnated with epoxy. The volumetric glass content was of 69% and no significant presence of defects was verified by an X-ray survey. The test has been carried out following as close as possible the ASTM standard E 328-86. The ring has been inserted into a dedicated hydraulic testing machine consisting of 18 radial pulling actuators and then loaded up to a ring membrane hoop stress of 800 MPa. The deformation has been maintained constant during the test by inserting a solid steel disk in the machine centre restraining the machine radial motion. Average hoop stress has been daily monitored measuring the force required to lift the ring just free of the constraints during the test period. The ring performed 125 testing days showing no significant stress relaxation and a small reduction of the ring stiffness that appeared mainly in the first days of the test. (C) 2009 Published by Elsevier B.V.
引用
收藏
页码:1649 / 1652
页数:4
相关论文
共 40 条
  • [31] Results of the implementation on a mock-up of the full 3dB hybrid matching option of the ITER ICRH system
    Grine, D.
    Vervier, M.
    Messiaen, A.
    Dumortier, P.
    RADIO FREQUENCY POWER IN PLASMAS: PROCEEDINGS OF THE 19TH TOPICAL CONFERENCE, 2011, 1406
  • [32] The plasma-facing components transporter (PFCT): A prototype system for PFC replacement on the new ITER 2001 cassette mock-up
    Micciche, G.
    Irving, M.
    Lorenzelli, L.
    Muro, L.
    FUSION ENGINEERING AND DESIGN, 2007, 82 (15-24) : 2055 - 2061
  • [33] Design and testing of a 5 GHz TE10-TE30 mode converter mock-up for the lower hybrid antenna proposed for ITER
    Hillairet, J.
    Achard, J.
    Brun, C.
    Rasio, S.
    Soler, B.
    FUSION ENGINEERING AND DESIGN, 2012, 87 (03) : 275 - 280
  • [34] High heat flux testing and post-mortem observation of small-scale ITER first wall mock-up made by HIP joining
    Japan Atomic Energy Research Inst, Ibaraki-ken, Japan
    Fusion Technol, 3 pt 2 (882-886):
  • [35] High heat flux testing and post-mortem observation of small-scale ITER first wall mock-up made by HIP joining
    Kanari, M
    Hatano, T
    Sato, S
    Furuya, K
    Kuroda, T
    Enoeda, M
    Takatsu, H
    FUSION TECHNOLOGY, 1998, 34 (03): : 882 - 886
  • [36] Mechanical modelling of the ITER toroidal field coils shear keys behavior: Design and choice of key mock-up for electrical insulation testing on the basis of numerical methods
    D.V. Efremov Research Inst, St. Petersburg, Russia
    IEEE Trans Magn, 4 pt 1 (3024-3027):
  • [37] Mechanical modeling of the ITER toroidal field coils shear keys behavior. Design and choice of key mock-up for electrical insulation testing on the basis of numerical models.
    Bondarchuk, E
    Krasnov, S
    Krivchenkov, Y
    Panin, A
    Efremov, DV
    IEEE TRANSACTIONS ON MAGNETICS, 1996, 32 (04) : 3024 - 3027
  • [38] Design and setup of a testing device to investigate a reduced sized attachment system mock up for the ITER EU HCPB-TBM under different mechanical loading conditions
    Zeile, Christian
    Maione, Ivan Alessio
    FUSION ENGINEERING AND DESIGN, 2014, 89 (7-8) : 1284 - 1288
  • [39] Development and material testing of OF-Cu/DS-Cu/OF-Cu triplex tube (dispersion strengthened copper clad with oxygen free-copper) and trial fabrication of a vertical target mock-up for ITER divertor
    Gotoh, Y
    Okamura, H
    Kajiura, S
    Kumagai, M
    Ando, T
    Akiba, M
    Suzuki, S
    Suzuki, T
    JOURNAL OF NUCLEAR MATERIALS, 1998, 258 : 271 - 274
  • [40] Effect of Cure System on the Life-time of Hydrogenated NBR O-ring using Intermittent Compression Stress Relaxation(CSR)
    Lee, Jin Hyok
    Bae, Jong Woo
    Kim, Jung Su
    Hwang, Tae Jun
    Choi, Yu Seok
    Baek, Kwang Sae
    Jo, Nam-Ju
    ELASTOMERS AND COMPOSITES, 2011, 46 (02): : 144 - 151