Mock-up testing of the monorail crane system for remote maintenance of the ITER neutral beam cell

被引:1
|
作者
Damiani, Carlo [1 ]
Smith, Kevin [1 ]
Gutierrez, Mikel Bilbao [1 ]
Balague, Susagna [1 ]
Van Uffelen, Marco [1 ]
Fichot, Denis [2 ]
Pelletier, Pierre-Robert [2 ]
Calloud, Vincent [2 ]
Fuzier, Frederic [2 ]
Montgomerie, Jon [3 ]
Choi, Chang-Hwan [4 ]
机构
[1] Fus Energy, Torres Diagonal Litoral B3,Josep Pl 2, Barcelona 08019, Spain
[2] REEL SAS, 69 Rue de la Chaux, F-69450 St Cyr Au Mont Dor, France
[3] Jacobs, 601 Faraday St,Birchwood Pk, Warrington WA3 6GN, England
[4] ITER Org, Route de Vinon sur Verdon,CS 90 046, F-13067 St Paul Les Durance, France
关键词
ITER; Neutral beam; Remote handling; Monorail crane; DESIGN;
D O I
10.1016/j.fusengdes.2022.113371
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The Monorail Crane System (MCS) is a remotely operated crane working in the ITER neutral beam (NB) cell within the Tokamak building that is a radiation controlled area where human worker access is limited. The MCS is an underhung crane that moves along the railways suspended from the NB cell ceiling. It is part of the Neutral Beam Remote Handling System (NBRHS) providing lifting and transportation capabilities for components and equipment up to 40tonnes. The long travel unit of the MCS is a first-of-a-kind design which is identified as the technical risky area for which is worth to perform mock-up testing.This paper describes the mock-up design of the railway where the MCS moves, and the long travel unit of the MCS. The mock-up railway replicates the critical parts of the railway such as that having the minimum bending radius, the S-bend, and the switching rails with discontinuity and misalignments. The mock-up MCS replicates most of the key features of the final MCS together with additional sensors for analysis. The mock-ups are manufactured to verify the manufacturing process of the final MCS. Phased testing campaigns are carried out to understand the behavior of the mock-up MCS on the different railway sections under various load cases such as no load, offset load, dynamic and static test loads, and considering different communication and control system arrangements including degraded modes. The test results demonstrate that the behavior of the mock-MCS is as expected in the design. However, a few areas are identified that need to be improved, which are the vibration and noise issues during traveling on the curved rails, stopping of traveling while carrying an offset load, which results in damage on the barcode strip and the busbar clamps installed on the railways. Post-test inspection identified permanent deformation on the edge of the railway, a leak on the lubrication on the rotating wheels, and some rusting, which need to be improved in the final MCS design. From a global point of view, no critical technical issues were observed during the testing and the tested components, especially, the high load carrying components are in good condition without any mechanical damages. Therefore, the MCS design can be further developed on this basis during the final design phase, addressing the various feedbacks gathered through the testing campaigns.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Design of the monorail crane system for remote handling of the ITER neutral beam cell
    Pelletier, Pierre-Robert
    Fuzier, Frederic
    Choi, Chang-Hwan
    Van Uffelen, Marco
    Bilbao Gutierrez, Mikel
    Damiani, Carlo
    Balague, Susagna
    Smith, Kevin
    Combescure, Didier
    Ruiz Morales, Emilio
    Chiappone, Marco
    Roberto, Campagnolo
    Ayneto Pou, Jordy
    Shi, Shanshuang
    Montgomerie, Jon
    Sherratt, Mark
    Nixon, Mike
    Merino, Alberto
    Haist, Bernhard
    [J]. FUSION ENGINEERING AND DESIGN, 2021, 172
  • [2] Applying remote handling attributes to the ITER neutral beam cell monorail crane
    Crofts, O.
    Allan, P.
    Raimbach, J.
    Tesini, A.
    Choi, C-H
    Damiani, C.
    Van Uffelen, M.
    [J]. FUSION ENGINEERING AND DESIGN, 2013, 88 (9-10) : 2057 - 2061
  • [3] Digital mock-up design of the remote steerable ITER ECRH launching system
    Ronden, DMS
    Bruschi, A
    Danilov, I
    Elzendoorn, BSQ
    Graswinckel, MF
    Heidinger, R
    Ramponi, G
    Verhoeven, AGA
    [J]. FUSION ENGINEERING AND DESIGN, 2005, 74 (1-4) : 443 - 447
  • [4] Mock-up test on key components of ITER blanket remote handling system
    Takeda, Nobukazu
    Kakudate, Satoshi
    Nakahira, Masataka
    Matsumoto, Yasuhiro
    Taguchi, Koh
    Kozaka, Hiroshi
    Shibanuma, Kiyoshi
    Tesini, Alessandro
    [J]. FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) : 1813 - 1817
  • [5] High heat flux test on the thermocouple embedded ITER neutral beam duct liner mock-up
    Park, C. K.
    Kim, H. S.
    Kim, G. H.
    Ahn, H. J.
    Kim, S. K.
    Lee, D. W.
    Urbani, M.
    [J]. FUSION ENGINEERING AND DESIGN, 2016, 109 : 152 - 158
  • [6] Remote maintenance scenario of the beam line components of the ITER neutral beam system
    Choi, Chang-Hwan
    Damiani, Carlo
    Gutierrez, Mikel Bilbao
    Graceffa, Joseph
    Urbani, Marc
    Tayibi, Anass El-Ouazzani
    [J]. FUSION ENGINEERING AND DESIGN, 2022, 185
  • [7] Mock-up testing facilities and qualification strategy for EU ITER TBMs
    Aiello, A.
    Buehler, L.
    Ciampichetti, A.
    Demange, D.
    Doerr, L.
    Freibergs, J. F.
    Ghidersa, B.
    Ilic, M.
    Laffont, G.
    Messemer, G.
    Platnieks, I.
    Rampal, G.
    [J]. FUSION ENGINEERING AND DESIGN, 2010, 85 (10-12) : 2012 - 2021
  • [8] Stress relaxation testing of pre-compression ring mock-up for the ITER magnet system
    Rossi, R.
    Annino, C.
    Baker, W.
    Bettinali, L.
    Knaster, J.
    Lo Bue, A.
    Mazzone, G.
    Nardi, C.
    Pizzuto, A.
    Semeraro, L.
    [J]. FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) : 1649 - 1652
  • [9] Status of ITER neutral beam cell remote handling system
    Sykes, N.
    Belcher, C.
    Choi, C-H
    Crofts, O.
    Crowe, R.
    Damiani, C.
    Delavalle, S.
    Meredith, L.
    Mindham, T.
    Raimbach, J.
    Tesini, A.
    Van Uffelen, M.
    [J]. FUSION ENGINEERING AND DESIGN, 2013, 88 (9-10) : 2043 - 2047
  • [10] Neutron and photon flux spectra in a mock-up of the ITER shielding system
    Freiesleben, H
    Hansen, W
    Richter, D
    Seidel, K
    Unholzer, S
    Fischer, U
    Wu, Y
    Angelone, M
    Batistoni, P
    Pillon, M
    [J]. FUSION ENGINEERING AND DESIGN, 1998, 42 : 247 - 253