Mock-up testing of the monorail crane system for remote maintenance of the ITER neutral beam cell

被引:1
|
作者
Damiani, Carlo [1 ]
Smith, Kevin [1 ]
Gutierrez, Mikel Bilbao [1 ]
Balague, Susagna [1 ]
Van Uffelen, Marco [1 ]
Fichot, Denis [2 ]
Pelletier, Pierre-Robert [2 ]
Calloud, Vincent [2 ]
Fuzier, Frederic [2 ]
Montgomerie, Jon [3 ]
Choi, Chang-Hwan [4 ]
机构
[1] Fus Energy, Torres Diagonal Litoral B3,Josep Pl 2, Barcelona 08019, Spain
[2] REEL SAS, 69 Rue de la Chaux, F-69450 St Cyr Au Mont Dor, France
[3] Jacobs, 601 Faraday St,Birchwood Pk, Warrington WA3 6GN, England
[4] ITER Org, Route de Vinon sur Verdon,CS 90 046, F-13067 St Paul Les Durance, France
关键词
ITER; Neutral beam; Remote handling; Monorail crane; DESIGN;
D O I
10.1016/j.fusengdes.2022.113371
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The Monorail Crane System (MCS) is a remotely operated crane working in the ITER neutral beam (NB) cell within the Tokamak building that is a radiation controlled area where human worker access is limited. The MCS is an underhung crane that moves along the railways suspended from the NB cell ceiling. It is part of the Neutral Beam Remote Handling System (NBRHS) providing lifting and transportation capabilities for components and equipment up to 40tonnes. The long travel unit of the MCS is a first-of-a-kind design which is identified as the technical risky area for which is worth to perform mock-up testing.This paper describes the mock-up design of the railway where the MCS moves, and the long travel unit of the MCS. The mock-up railway replicates the critical parts of the railway such as that having the minimum bending radius, the S-bend, and the switching rails with discontinuity and misalignments. The mock-up MCS replicates most of the key features of the final MCS together with additional sensors for analysis. The mock-ups are manufactured to verify the manufacturing process of the final MCS. Phased testing campaigns are carried out to understand the behavior of the mock-up MCS on the different railway sections under various load cases such as no load, offset load, dynamic and static test loads, and considering different communication and control system arrangements including degraded modes. The test results demonstrate that the behavior of the mock-MCS is as expected in the design. However, a few areas are identified that need to be improved, which are the vibration and noise issues during traveling on the curved rails, stopping of traveling while carrying an offset load, which results in damage on the barcode strip and the busbar clamps installed on the railways. Post-test inspection identified permanent deformation on the edge of the railway, a leak on the lubrication on the rotating wheels, and some rusting, which need to be improved in the final MCS design. From a global point of view, no critical technical issues were observed during the testing and the tested components, especially, the high load carrying components are in good condition without any mechanical damages. Therefore, the MCS design can be further developed on this basis during the final design phase, addressing the various feedbacks gathered through the testing campaigns.
引用
收藏
页数:9
相关论文
共 50 条
  • [41] ITER hot Cell-Remote handling system maintenance overview
    Friconneau, J-P
    Beaudoin, V.
    Dammann, A.
    Dremel, C.
    Martins, J. P.
    Pitcher, C. S.
    FUSION ENGINEERING AND DESIGN, 2017, 124 : 673 - 676
  • [42] The plasma-facing components transporter (PFCT): A prototype system for PFC replacement on the new ITER 2001 cassette mock-up
    Micciche, G.
    Irving, M.
    Lorenzelli, L.
    Muro, L.
    FUSION ENGINEERING AND DESIGN, 2007, 82 (15-24) : 2055 - 2061
  • [43] Design and testing of a 5 GHz TE10-TE30 mode converter mock-up for the lower hybrid antenna proposed for ITER
    Hillairet, J.
    Achard, J.
    Brun, C.
    Rasio, S.
    Soler, B.
    FUSION ENGINEERING AND DESIGN, 2012, 87 (03) : 275 - 280
  • [44] High heat flux testing and post-mortem observation of small-scale ITER first wall mock-up made by HIP joining
    Japan Atomic Energy Research Inst, Ibaraki-ken, Japan
    Fusion Technol, 3 pt 2 (882-886):
  • [45] High heat flux testing and post-mortem observation of small-scale ITER first wall mock-up made by HIP joining
    Kanari, M
    Hatano, T
    Sato, S
    Furuya, K
    Kuroda, T
    Enoeda, M
    Takatsu, H
    FUSION TECHNOLOGY, 1998, 34 (03): : 882 - 886
  • [46] Mechanical modelling of the ITER toroidal field coils shear keys behavior: Design and choice of key mock-up for electrical insulation testing on the basis of numerical methods
    D.V. Efremov Research Inst, St. Petersburg, Russia
    IEEE Trans Magn, 4 pt 1 (3024-3027):
  • [47] Mechanical modeling of the ITER toroidal field coils shear keys behavior. Design and choice of key mock-up for electrical insulation testing on the basis of numerical models.
    Bondarchuk, E
    Krasnov, S
    Krivchenkov, Y
    Panin, A
    Efremov, DV
    IEEE TRANSACTIONS ON MAGNETICS, 1996, 32 (04) : 3024 - 3027
  • [48] A study on beam-to-column moment-resisting timber connections under service load, comparing full-scale connection testing and mock-up frame assembly
    Aivars Vilguts
    Sveinung Ørjan Nesheim
    Haris Stamatopoulos
    Kjell Arne Malo
    European Journal of Wood and Wood Products, 2022, 80 : 753 - 770
  • [49] A study on beam-to-column moment-resisting timber connections under service load, comparing full-scale connection testing and mock-up frame assembly
    Vilguts, Aivars
    Nesheim, Sveinung Orjan
    Stamatopoulos, Haris
    Malo, Kjell Arne
    EUROPEAN JOURNAL OF WOOD AND WOOD PRODUCTS, 2022, 80 (04) : 753 - 770
  • [50] Design and setup of a testing device to investigate a reduced sized attachment system mock up for the ITER EU HCPB-TBM under different mechanical loading conditions
    Zeile, Christian
    Maione, Ivan Alessio
    FUSION ENGINEERING AND DESIGN, 2014, 89 (7-8) : 1284 - 1288