Research on the Process and Types of the Construction Projects

被引:0
|
作者
Xie, Hai [1 ]
Liu, Xuan [1 ]
机构
[1] Harbin Univ, Harbin 150086, Peoples R China
关键词
Process; Types; Construction projects; CEMENT; WOOD; COMPATIBILITY; BUILDINGS;
D O I
10.4028/www.scientific.net/AMM.501-504.2664
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the fields of architecture and civil engineering, construction is a process that consists of the building or assembling of infrastructure. Far from being a single activity, large scale construction is a feat of human multitasking. Normally, the job is managed by a project manager, and supervised by a construction manager, design engineer, construction engineer or project architect. For the successful execution of a project, effective planning is essential. Those involved with the design and execution of the infrastructure in question must consider the environmental impact of the job, the successful scheduling, budgeting, construction site safety, availability of building materials, logistics, and inconvenience to the public caused by construction delays and bidding.
引用
收藏
页码:2664 / +
页数:2
相关论文
共 50 条
  • [41] Research into the Psychosocial Safety Climate of Engineering Construction Projects
    Xie, Linlin
    Lin, Guixin
    Hon, Carol
    Xia, Bo
    Skitmore, Martin
    CONSTRUCTION RESEARCH CONGRESS 2020: SAFETY, WORKFORCE, AND EDUCATION, 2020, : 231 - 238
  • [42] Research on Drifting Goals in the Construction of Public Projects in China
    Wang Xiao
    Wang Cheng-yan
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (9TH), VOL II, 2013, : 371 - 375
  • [43] NIH spends $1 billion on research construction projects
    Trager, Rebecca
    CHEMISTRY WORLD, 2010, 7 (07): : 7 - 7
  • [44] Bibliometric evaluation of research on political risks in construction projects
    Wei, Chunling
    Deng, Xiaopeng
    Chang, Tengyuan
    Mahmoudi, Amin
    Ullah, Safi
    JOURNAL OF PROJECT MANAGEMENT, 2021, 6 (04) : 191 - 208
  • [45] Research on the Developing Process and the Types of Bridges
    Zhang, Zhijun
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1117 - 1120
  • [46] The formal evaluation process of research projects in the Health Research Fund
    Trilla, Antoni
    ENFERMERIA CLINICA, 2007, 17 (01): : 32 - 36
  • [47] Research on Treatment Methods and Pollution Control of Construction Wastewater in Hydropower Construction Projects
    Zhao, Chunzhe
    2020 6TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL ENGINEERING, PTS 1-5, 2020, 546
  • [48] Research on the application of the construction agent system in the construction projects of the Beijing Olympic Games
    Zhang Xiaoqiao
    Chen Jinfeng
    Yao Bing
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 499 - 502
  • [49] The Project Management Process of Planning and Budgeting in Public Construction Projects
    Larsen, Jesper Kranker
    Ussing, Lene Faber
    Brunoe, Thomas Ditlev
    Lindhard, Soren Munch
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2015, 6 (04) : 20 - 33
  • [50] A Study of Risk Management for Construction Process of Tunnel Engineering Projects
    Hu, Hao
    Li, Jingjing
    Wang, Feng
    Zhang, Jun
    2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (MSE 2010), VOL 3, 2010, : 491 - 495