Proposal and techno-economic analysis of a novel system for waste heat recovery and water saving in coal-fired power plants: A case study

被引:26
|
作者
Tan, Houzhang [1 ]
Cao, Ruijie [1 ]
Wang, Shunsen [1 ]
Wang, Yibin [1 ]
Deng, Shuanghui [1 ]
Duic, Neven [2 ]
机构
[1] Xi An Jiao Tong Univ, Sch Energy & Power Engn, Xian, Shaanxi, Peoples R China
[2] Univ Zagreb, Fac Mech Engn & Naval Architecture, Zagreb, Croatia
关键词
Waste heat recovery; Coal consumption; Water saving; Coal-fired power plant; Flue gas; Techno-economic analysis; PHASE-TRANSITION AGGLOMERATOR; FLUE-GAS; LATENT-HEAT; CYCLE; PUMP;
D O I
10.1016/j.jclepro.2020.124372
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A novel system, which systematically recover waste heat and reduce water consumption in coal-fired power plants, is proposed in this paper. Critical components of the system are two fluorine plastic heat exchangers (FHEs) located downstream and upstream of WFGD scrubber, and condensate and feed water extracted from the regenerative heater (RH) act as coolants, respectively. All recovered heat is utilized directly with no heat pump required. A thermodynamic model, where the steam/water cycle is coupled with the exhaust flue gas flow, is built to assess the performance of the system, and the economic analysis is involved to further explore the feasibility. The simulation is conducted based on parameters of a 1000 MW coal-fired power unit in operation, while coal and water saving rates, payback period, and net present value (NPV) are used as criteria in the assessment. The results show that the system can significantly reduce coal and water consumption of the reference power unit. The temperature of condensate and feed water extraction determines the techno-economic performance of the low-and high-temperature FHEs (LFHE and HFHE), respectively. Lower condensate temperature and higher feed water extraction temperature are more beneficial. Compared with the case of only LFHE, integrating HFHE into the system will increase the overall coal and water saving rates obviously, although the performance of LFHE is weakened. All layouts of the system presented in this paper are techno-economically feasible, and the layout in Case 4 where HFHE is installed in parallel with RH6 is the optimal one. Coal and water saving rates, and NPV of the optimal layout are up to 4.11 g/kWh, 95 t/h, and 102,739,000 RMB, respectively, while the payback period is less than 4 y. Application of this system is beneficial to mitigating the environmental problems caused by coal-fired power generation. (C) 2020 Elsevier Ltd. All rights reserved.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Techno-economic analysis on a new conceptual design of waste heat recovery for boiler exhaust flue gas of coal-fired power plants
    Jin, Yunli
    Gao, Naiping
    Zhu, Tong
    ENERGY CONVERSION AND MANAGEMENT, 2019, 200
  • [2] Techno-economic evaluation of revamping of coal-fired power plants in India
    Dutta, Animesh
    Dutta, Shantanu
    Basu, Prabir
    INTERNATIONAL JOURNAL OF GLOBAL ENERGY ISSUES, 2006, 26 (1-2) : 6 - 42
  • [3] Techno-economic evaluation of oxy-combustion coal-fired power plants
    XIONG Jie ZHAO HaiBo ZHENG ChuGuang State Key Laboratory of Coal Combustion Huazhong University of Science and Technology Wuhan China
    Chinese Science Bulletin, 2011, 56 (31) : 3333 - 3345
  • [4] Techno-economic evaluation of oxy-combustion coal-fired power plants
    Xiong Jie
    Zhao HaiBo
    Zheng ChuGuang
    CHINESE SCIENCE BULLETIN, 2011, 56 (31): : 3333 - 3345
  • [5] Thermodynamic, Operational, and Techno-economic Analysis of A Novel Coal-fired Cogeneration System Integrated with Heat Pumps
    Zhao, Shifei
    Duan, Fan
    Tian, Ze
    Wang, Chunlan
    2024 6TH ASIA ENERGY AND ELECTRICAL ENGINEERING SYMPOSIUM, AEEES 2024, 2024, : 1272 - 1277
  • [6] Techno-economic evaluation of oxy-combustion coal-fired power plants
    XIONG Jie
    Science Bulletin, 2011, (31) : 3333 - 3345
  • [7] THERMO-ECONOMIC ANALYSIS ON WASTE HEAT AND WATER RECOVERY SYSTEMS OF BOILER EXHAUST IN COAL-FIRED POWER PLANTS
    Yang, Kaixuan
    Liu, Ming
    Yan, Junjie
    PROCEEDINGS OF THE ASME 2020 POWER CONFERENCE (POWER2020), 2020,
  • [8] Techno-Economic Analysis of Solar Tower Aided Coal-Fired Power Generation System
    Zhu, Yong
    Zhai, Rongrong
    Yang, Yongping
    Angel Reyes-Belmonte, Miguel
    ENERGIES, 2017, 10 (09):
  • [9] Simulation and techno-economic analysis of moisture and heat recovery from original flue gas in coal-fired power plants by macroporous ceramic membrane
    Zhao, Chunhao
    Wang, Zhengfeng
    Gao, Dan
    Chen, Haiping
    Zhang, Heng
    ENERGY, 2022, 259
  • [10] Techno-Economic Analysis of CO2 Capture Processes from Coal-fired Power Plants
    Yun, Seokwon
    Lee, Sunghoon
    Kim, Jin-Kuk
    28TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2018, 43 : 1519 - 1520