Application of Fuzzy Comprehensive Evaluation Model Based on Variable Fuzzy Set Method in Construction Enterprises' ERP Project Risk Evaluation

被引:4
|
作者
Wu Yunna [1 ]
Huang Zhijun [1 ]
机构
[1] N China Elect Power Univ, Sch Business Adm, Beijing, Peoples R China
关键词
D O I
10.1109/ICRMEM.2008.48
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Construction Enterprises need to implement ERP projects to constantly improve their competitiveness in the future. However, as having been proved to be an enormously invested and systematically risky project, ERP usually makes construction enterprises fall into "two-difficult" choices. Therefore, a scientific risk evaluation is urgently needed to increase the success rate of ERP project. This paper, after having reviewed a large amount of literatures, establishes a risk evaluation index system for construction enterprises' ERP project. A fuzzy comprehensive evaluation model is then proposed. This model, supported by variable fuzzy set method, makes full use of expert experiences and calculates the membership degree in a better way. And then, an actual case is involved in this paper to verify its scientificity and practicality.
引用
下载
收藏
页码:466 / 471
页数:6
相关论文
共 50 条
  • [21] Risk Evaluation of Railway Construction Project Based on Fuzzy AHP
    Bai Yunfei
    Ren Xun
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 4297 - 4300
  • [22] Dynamic fuzzy evaluation of construction project risk based on collaboration
    Gao, Yun-Li
    Li, Hong-Nan
    Zhang, Guo-Jun
    Dalian Ligong Daxue Xuebao/Journal of Dalian University of Technology, 2010, 50 (03): : 404 - 408
  • [23] Application of Fuzzy Comprehensive Evaluation in Bidding Risk Assessment on International Project
    Wang Xinzheng
    Xing Liying
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2009, : 218 - 223
  • [24] The Application of Fuzzy Comprehensive Evaluation in the Performance Evaluation on Oil Field Enterprises
    Huo Jianglin
    Liu Surong
    COMPREHENSIVE EVALUATION OF ECONOMY AND SOCIETY WITH STATISTICAL SCIENCE, 2010, : 101 - 105
  • [25] Comprehensive Water Quality Evaluation Based on Variable Fuzzy Model
    Ke, Lina
    Wang, Quanming
    Li, Yonghua
    Cao, Yongqiang
    PROGRESS IN ENVIRONMENTAL SCIENCE AND ENGINEERING, PTS 1-4, 2013, 610-613 : 872 - +
  • [26] Application of fuzzy mathematics for competence evaluation in construction enterprises
    Luo, Fuzhou
    Xu, Fei
    PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2006, : 388 - 391
  • [27] Fuzzy method for safety evaluation of construction project
    Yao Jinbao
    Xia He
    Zhan Jiawang
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 6, PTS A AND B, 2006, 6 : 229 - 233
  • [28] Research on the Risk Evaluation of the Medical Care combined PPP Project Based on the Fuzzy Comprehensive Evaluation Method
    Wang, Lifang
    Xiong, Huaping
    CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 1287 - 1293
  • [29] Risk Evaluation System of Utility Tunnel PPP Project Research Based on Fuzzy Comprehensive Evaluation Method
    Mao, Yihua
    Zhang, Yaoyao
    PROCEEDINGS OF THE 2017 INTERNATIONAL CONFERENCE ON INNOVATIONS IN ECONOMIC MANAGEMENT AND SOCIAL SCIENCE (IEMSS 2017), 2017, 29 : 550 - 555
  • [30] Research On Risk Management Of Power Engineering Project Based On Fuzzy Comprehensive Evaluation Method
    Li Jia-ming
    PROCEEDINGS OF THE 2017 2ND JOINT INTERNATIONAL INFORMATION TECHNOLOGY, MECHANICAL AND ELECTRONIC ENGINEERING CONFERENCE (JIMEC 2017), 2017, 62 : 325 - 329