共 50 条
- [31] A Risk Management Methodology for R&D Project Risk Based on AHP and Fuzzy Comprehensive Evaluation Method 2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 320 - 324
- [32] Study on main contents of highway construction project post-evaluation Xi'an Gonglu Jiaotong Daxue Xuebao/Journal of Xi'an Highway University, 2001, 21 (03):
- [33] R&D project prioritisation model for public research institutes JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2002, 61 (12): : 1033 - 1038
- [35] Research on Profit Distribution of Collaborative R&D in Mega Project 2016 23RD ANNUAL INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS. I AND II, 2016, : 1444 - 1449
- [36] Research on Fuzzy Comprehensive Evaluation of R&D Staff Based on Competency Model and Case Analysis 2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 3, PROCEEDINGS, 2009, : 133 - 136
- [37] A Fuzzy Comprehensive Evaluation System Based Delphi-AHP and Its Application to R&D Planning Project Evaluation PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2017, 502 : 341 - 351
- [38] The Post-Evaluation Indicators-System of Public Investment Project NINTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2010, : 1859 - 1864