A Chance Constrained Information-Gap Decision Model for Multi-Period Microgrid Planning

被引:71
|
作者
Cao, Xiaoyu [1 ]
Wang, Jianxue [1 ]
Zeng, Bo [2 ,3 ]
机构
[1] Xi An Jiao Tong Univ, Sch Elect Engn, Xian 710049, Shaanxi, Peoples R China
[2] Univ Pittsburgh, Dept Ind Engn, Pittsburgh, PA 15106 USA
[3] Univ Pittsburgh, Dept Elect & Comp Engn, Pittsburgh, PA 15106 USA
基金
美国国家科学基金会; 中国国家自然科学基金;
关键词
Microgrid; multi-period expansion planning; information gap decision theory; chance constrained program; bilinear Benders decomposition; MULTIOBJECTIVE OPTIMIZATION; SYSTEM; GENERATION; SIMULATION; FRAMEWORK;
D O I
10.1109/TPWRS.2017.2747625
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a chance constrained information gap decision model for multi-period microgrid expansion planning (MMEP) considering two categories of uncertainties, namely random and non-random uncertainties. The main task of MMEP is to determine the optimal sizing, type selection, and installation time of distributed energy resources (DER) in microgrid. In the proposed formulation, information gap decision theory (IGDT) is applied to hedge against the non-random uncertainties of long-term demand growth. Then, chance constraints are imposed in the operational stage to address the random uncertainties of hourly renewable energy generation and load variation. The objective of chance constrained information gap decision model is to maximize the robustness level of DER investment meanwhile satisfying a set of operational constraints with a high probability. The integration of IGDT and chance constrained program, however, makes it very challenging to compute. To address this challenge, we propose and implement a strengthened bilinear Benders decomposition method. Finally, the effectiveness of proposed planning model is verified through the numerical studies on both the simple and practical complex microgrid. Also, our new computational method demonstrates a superior solution capacity and scalability. Compared to directly using a professional mixed integer programming solver, it could reduce the computational time by orders of magnitude.
引用
收藏
页码:2684 / 2695
页数:12
相关论文
共 50 条
  • [41] Information-Gap Decision Theory for Robust Security-Constrained Unit Commitment of Joint Renewable Energy and Gridable Vehicles
    Ahmadi, Abdollah
    Nezhad, Ali Esmaeel
    Siano, Pierluigi
    Hredzak, Branislav
    Saha, Sajeeb
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2020, 16 (05) : 3064 - 3075
  • [42] A multi-period model for the optimization of the products and information flows in a healthcare system
    Celeste Kees, M.
    Susana Moreno, M.
    Alberto Bandoni, J.
    27TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT C, 2017, 40C : 2809 - 2814
  • [43] The graph model for conflict resolution with information-gap uncertainty in preferences
    Ben-Haim, Y
    Hipel, KW
    APPLIED MATHEMATICS AND COMPUTATION, 2002, 126 (2-3) : 319 - 340
  • [44] A stochastic optimal scheduling of multi-microgrid systems considering emissions: A chance constrained model
    Aghdam, Farid Hamzeh
    Kalantari, Navid Taghizadegan
    Mohammadi-Ivatloo, Behnam
    JOURNAL OF CLEANER PRODUCTION, 2020, 275 (275)
  • [45] Multi-period design of hybrid microgrid under multi-timescale uncertainties
    Kim, Sunwoo
    Lee, Jay H.
    IFAC PAPERSONLINE, 2023, 56 (02): : 1449 - 1453
  • [46] Information-gap decision theory based transient stability constrained optimal power flow considering the uncertainties of wind energy resources
    Ayvaz, Alisan
    Genc, V. M. Istemihan
    IET RENEWABLE POWER GENERATION, 2020, 14 (11) : 1946 - 1955
  • [47] Multi-period inventory games with information update
    Zhang, Jian
    Zhang, Juliang
    Hua, Guowei
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 174 : 119 - 127
  • [49] A multi-period optimisation model for planning carbon sequestration retrofits in the electricity sector
    Lee, Jui-Yuan
    APPLIED ENERGY, 2017, 198 : 12 - 20
  • [50] Multi-period mine planning with multi-process routes
    Kumral, Mustafa
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2013, 23 (03) : 317 - 321