A Chance Constrained Information-Gap Decision Model for Multi-Period Microgrid Planning

被引:71
|
作者
Cao, Xiaoyu [1 ]
Wang, Jianxue [1 ]
Zeng, Bo [2 ,3 ]
机构
[1] Xi An Jiao Tong Univ, Sch Elect Engn, Xian 710049, Shaanxi, Peoples R China
[2] Univ Pittsburgh, Dept Ind Engn, Pittsburgh, PA 15106 USA
[3] Univ Pittsburgh, Dept Elect & Comp Engn, Pittsburgh, PA 15106 USA
基金
美国国家科学基金会; 中国国家自然科学基金;
关键词
Microgrid; multi-period expansion planning; information gap decision theory; chance constrained program; bilinear Benders decomposition; MULTIOBJECTIVE OPTIMIZATION; SYSTEM; GENERATION; SIMULATION; FRAMEWORK;
D O I
10.1109/TPWRS.2017.2747625
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a chance constrained information gap decision model for multi-period microgrid expansion planning (MMEP) considering two categories of uncertainties, namely random and non-random uncertainties. The main task of MMEP is to determine the optimal sizing, type selection, and installation time of distributed energy resources (DER) in microgrid. In the proposed formulation, information gap decision theory (IGDT) is applied to hedge against the non-random uncertainties of long-term demand growth. Then, chance constraints are imposed in the operational stage to address the random uncertainties of hourly renewable energy generation and load variation. The objective of chance constrained information gap decision model is to maximize the robustness level of DER investment meanwhile satisfying a set of operational constraints with a high probability. The integration of IGDT and chance constrained program, however, makes it very challenging to compute. To address this challenge, we propose and implement a strengthened bilinear Benders decomposition method. Finally, the effectiveness of proposed planning model is verified through the numerical studies on both the simple and practical complex microgrid. Also, our new computational method demonstrates a superior solution capacity and scalability. Compared to directly using a professional mixed integer programming solver, it could reduce the computational time by orders of magnitude.
引用
收藏
页码:2684 / 2695
页数:12
相关论文
共 50 条
  • [21] Microgrid Optimal Scheduling With Multi-Period Islanding Constraints
    Khodaei, Amin
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (03) : 1383 - 1392
  • [22] Multi-objective robust transmission expansion planning using information-gap decision theory and augmented e-constraint method
    Dehghan, Shahab
    Kazemi, Ahad
    Amjady, Nima
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2014, 8 (05) : 828 - 840
  • [23] Multi-objective planning of microgrid with electric vehicle charging load based on information gap decision theory
    Peng Q.
    Wang X.
    Shao C.
    Shi S.
    Qi S.
    Wang Z.
    Yan S.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2021, 41 (01): : 128 - 134and158
  • [24] MULTI-OBJECTIVE DECISION MAKING IN MULTI-PERIOD ACQUISITION PLANNING UNDER DEEP UNCERTAINTY
    Moallemi, Enayat A.
    Elsawah, Sondoss
    Turan, Hasan H.
    Ryan, Michael J.
    2018 WINTER SIMULATION CONFERENCE (WSC), 2018, : 1334 - 1345
  • [25] PROBABILISTIC GOAL PROGRAMMING MODEL FOR MULTI-PERIOD AIRCRAFT PRODUCTION PLANNING
    LEE, SM
    CLAYTON, ER
    OPERATIONS RESEARCH, 1975, 23 : B319 - B319
  • [26] Multi-period Product Configuration Change Planning: An Application of a Hybrid Algorithm Multi-period Product Configuration Change Planning
    Chiang, C. J.
    Che, Z. H.
    Wang, H. S.
    PROCEEDINGS OF THE 2009 WRI GLOBAL CONGRESS ON INTELLIGENT SYSTEMS, VOL II, 2009, : 53 - 57
  • [27] Sourcing Decision in a Multi-Period Model under Demand and Supply Uncertainty
    Bagchi, Shantanu Shankar
    Bhattacharya, Sourabh
    INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND SUPPLY CHAIN MANAGEMENT, 2014, 7 (04) : 50 - 68
  • [28] On multi-period multi-attribute decision making
    Xu, Zeshui
    KNOWLEDGE-BASED SYSTEMS, 2008, 21 (02) : 164 - 171
  • [29] Multi-period design and planning model of shale gas field development
    Peng, Zedong
    Li, Can
    Grossmann, Ignacio E.
    Kwon, Kysang
    Ko, Sukjoon
    Shin, Joohyun
    Feng, Yiping
    AICHE JOURNAL, 2021, 67 (08)
  • [30] Multi-objective Chance Constrained Programming Model for Operational-Planning of V2G Integrated Microgrid
    Waqar, Asad
    Wang, Shaorong
    Khalid, Muhammad S.
    Shi, Xiaohan
    2015 5TH INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES (DRPT 2015), 2015, : 443 - 448