共 50 条
- [21] Vulnerability Threat Assessment Based on AHP And Fuzzy Comprehensive Evaluation 2014 SEVENTH INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN (ISCID 2014), VOL 2, 2014,
- [22] City Safety Evaluation Model Based on AHP and Fuzzy Comprehensive 2017 7TH INTERNATIONAL CONFERENCE ON EDUCATION AND SPORTS EDUCATION (ESE 2017), VOL 2, 2017, 75 : 368 - 372
- [23] Fuzzy Comprehensive Evaluation of Residential Harmony Based on AHP Model PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 867 - +
- [24] A comprehensive evaluation approach for machining operation based on fuzzy AHP MECHANICAL SCIENCE AND ENGINEERING IV, 2014, 472 : 1079 - +
- [25] A Fuzzy AHP-Based Comprehensive Evaluation of Cost-Overrun Risks in Construction Projects in China CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1472 - 1486
- [26] Comprehensive Post-Evaluation of Rural Electric Network Reformation based on Fuzzy Interval Number AHP 2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 171 - 177
- [28] The Evaluation on Competitiveness of Baoding New Energy Industrial Cluster Based on AHP and Fuzzy Comprehensive Assessment PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 577 - 580
- [29] Study on evaluation system of enterprise's 'Green degree' based on AHP and fuzzy comprehensive evaluation (FCE) Proceedings of the 3rd International Conference on Innovation & Management, Vols 1 and 2, 2006, : 1384 - 1388