Project Hydropower Plant "Iller Au" - An Ecological Compatible Hydropower Plant with Dynamic Regulation of Operation Water Level

被引:0
|
作者
Fessler, Walter [1 ]
Wiegand, Volker [1 ]
Brennauer, Bernd [1 ]
Schuchert, Michael [2 ]
机构
[1] Allgauer Uberlandwerk GmbH AUW, Illerstr 18, D-87435 Kempten, Germany
[2] Ingenieurbiko Dr Ing Koch Bauplanung GmbH, Beethovenstr 13, D-87435 Kempten, Germany
关键词
D O I
暂无
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
The article reports about the project development process to the point of the initial operation of a VLH-turbine with two rubber dams including an outlet-dependency on the regulation of operation water level. The characteristic of this power plant, situated on the river Iller in Sulzberg near Kempten, is a low head between 1.4 and 2.3 m as well as the local conditions. The use of the VLH-technique in a mountain river and in combination with a dynamic regulation of retention water level elevation is so far unique. To improve the annual output of approximately 3.9 million kWh/a, the retention water level elevation will be triggered for a defined schedule and therefore the ecological changes of the aquatic ecology will be minimized. The realization of this project supports the strategy of the Bavarian government in a program for small power plants with an installed capacity < 1 MW. In this context the Bavarian government focuses also on innovative concepts of water power plants, which represent a special water-compatible kind of water power as "ecological water power stations". For realization of this project a joint company, the Illerkraftwerk Au GmbH was established by AUW and the Bavarian Landeswasserkraftwerke GmbH.
引用
下载
收藏
页码:55 / 61
页数:7
相关论文
共 50 条
  • [21] Adjustable speed operation of a hydropower plant associated to an irrigation reservoir
    Perez, Juan I.
    Wilhelmi, Jose R.
    Maroto, Luis
    ENERGY CONVERSION AND MANAGEMENT, 2008, 49 (11) : 2973 - 2978
  • [22] Ecological Micro Hydropower Plant with Axial Hydro-Turbine
    Kuzmin, Roman V.
    Meshkov, Alexandr S.
    Susdorf, Viktor I.
    PROCEEDINGS OF 2015 INTERNATIONAL CONFERENCE ON FLUID POWER AND MECHATRONICS - FPM 2015, 2015, : 724 - 728
  • [23] Hydropower plant operation rules optimization response to climate change
    Chang, Jianxia
    Wang, Xiaoyu
    Li, Yunyun
    Wang, Yimin
    Zhang, Hongxue
    ENERGY, 2018, 160 : 886 - 897
  • [25] Algorithm of Smart Control System Operation of Small Hydropower Plant
    Varfolomejeva, Renata
    Umbrasko, Inga
    Mahnitko, Anatolij
    2013 12TH INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING (EEEIC 2013), 2013, : 330 - 334
  • [26] HYDROPOWER PLANT OPERATION SCENARIOS TO IMPROVE BROWN TROUT HABITAT
    Pragana, I.
    Boavida, I.
    Cortes, R.
    Pinheiro, A.
    RIVER RESEARCH AND APPLICATIONS, 2017, 33 (03) : 364 - 376
  • [27] Conflict over a hydropower plant project between Tajikistan and Uzbekistan
    Ito, Sonoko
    El Khatib, Sameh
    Nakayama, Mikiyasu
    INTERNATIONAL JOURNAL OF WATER RESOURCES DEVELOPMENT, 2016, 32 (05) : 692 - 707
  • [28] The Belo Monte hydropower plant project: the energy autocracy as a paradigm
    Bermann, Celio
    NOVOS CADERNOS NAEA, 2012, 15 (01): : 5 - 23
  • [29] Comparison study between dynamic programming and particle swarm algorithm for the optimal operation of hydropower plant
    Cheng, Chuntian
    Tang, Zitian
    Li, Gang
    Yang, Binbin
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2008, 27 (06): : 27 - 31
  • [30] Extreme water level of surge chamber in hydropower plant under combined operating conditions
    Zhang, Jian
    Qiu, Weixin
    Wang, Qinyi
    Yao, Tianyu
    Hu, Chao
    Liu, Yi
    CHAOS SOLITONS & FRACTALS, 2024, 178